Bibliographic citations
Fernández, L., Cabrera, S. (2021). Guía para medir el impacto en los costos de la especialidad de estructuras para obras de viviendas multifamiliares debido al COVID-19 [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/658121
Fernández, L., Cabrera, S. Guía para medir el impacto en los costos de la especialidad de estructuras para obras de viviendas multifamiliares debido al COVID-19 [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2021. http://hdl.handle.net/10757/658121
@misc{sunedu/3040405,
title = "Guía para medir el impacto en los costos de la especialidad de estructuras para obras de viviendas multifamiliares debido al COVID-19",
author = "Cabrera García, Sebastián Fernando",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2021"
}
The new normality as a result of COVID-19 demands a change in all productive sectors worldwide. In this sense, the construction sector is not exempt from establishing new procedures and modifications to the cost of constructions, such as multifamily housing works, for which a guide is presented in order to measure the impact of the pandemic. The process for the elaboration of the guide has started with the diagnosis of the variation of costs, for which information was obtained from three multifamily housing projects. The analysis of the three case studies is carried out on the most relevant items of the specialty of structures in order to evaluate their behavior between the pre and post social immobilization stages, thus being able to determine the impact of the pandemic. Considering that this research is of explanatory level, by analyzing the cause and effect, the statistical rigor is present with the support of the experts who gave their opinions based on the guide, which allows improving the methodology and other elements for the perfection of this one. Determining the impact on the costs of the specialty of structures for multifamily housing projects involves the analysis of resources: labor, materials, equipment and subcontracts. Likewise, the variation in costs is related to the implementation of guidelines for the surveillance and prevention and control of the health of workers at risk of exposure established by Ministerial Resolution No. 448.2020.MINSA
This item is licensed under a Creative Commons License