Look-up in Google Scholar
Title: Análisis de costos y eficiencia del encofrado de plástico en columnas y vigas
Advisor(s): Ravines Azañero, Irene del Rosario
OCDE field: https://purl.org/pe-repo/ocde/ford#2.01.01
Issue Date: 18-Dec-2017
Institution: Universidad Privada del Norte
Abstract: El objetivo del presente trabajo de investigación se centra en estudiar los encofrados plásticos en columnas y vigas con el fin de establecer costos y eficiencia, para tal fin se realizó el estudio en la obra: Construcción escuela técnico PNP San Bartolo-Lima Perú, durante su proceso constructivo, usando un formato de recolección de datos en el que se consignó dentro de la eficiencia variables como acabados y tiempos, mientras que para el costo se usó las variables de mano de obra, materiales y herramientas cotizados por una empresa dedicada al alquiler de encofrados plásticos, dichos datos se comparan con respecto a los establecidos por CAPECO para un encofrado tradicional de madera, determinándose que los encofrados plásticos con respecto a los costos aumentan el costo unitario en un 29.88% en columnas y un 10.89% en vigas frente al encofrado tradicional de madera ,respecto a la eficiencia reducen el tiempo de instalación en un 44.44% para columnas y para vigas un 47.06% frente al encofrado tradicional, también poseen buen acabado(Liso) y buena verticalidad.

The objective of the present research work is to study the plastic formwork in columns and beams in order to establish costs and efficiency. For this purpose the study was carried out in the construction: PNP SAN BARTOLO-LIMA PERU TECHNICAL SCHOOL CONSTRUCTION, during its using a data collection format in which variables such as finishes and times were recorded within the efficiency, while for the cost the variables of labor, materials and tools quoted by a company dedicated to the rental of plastic formwork, these data are compared with those of CAPECO for a traditional wooden formwork, it being determined that the plastic formworks with respect to the costs increase the unit cost by 29.88% in columns and 10.89% in beams in front of the formwork traditional timber, compared to efficiency reduce installation time by 44.44% for columns and for beams a 47.06% compared to traditional formwork, also have good finish (smooth) and good verticality.
Note: Cajamarca
Discipline: Ingeniería Civil
Grade or title grantor: Universidad Privada del Norte. Facultad de Ingeniería
Grade or title: Ingeniero Civil
Juror: Aguilar Aliaga, Orlando; Huamán Tanta, Martha; De La Torre Ramírez, Salomé
Register date: 27-Jan-2018; 27-Jan-2018



This item is licensed under a Creative Commons License Creative Commons