Bibliographic citations
Cicchini, A., Nomberto, E. (2018). Propuesta de un sistema integrado de gestión de calidad, medio ambiente y seguridad y salud ocupacional en base a las normas ISO 9001: 2015, ISO 14001: 2004 y OHSAS 18001: 2007 para reducir los costos operativos de la empresa Fox Wagen Motor Sport S. A. C [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/13191
Cicchini, A., Nomberto, E. Propuesta de un sistema integrado de gestión de calidad, medio ambiente y seguridad y salud ocupacional en base a las normas ISO 9001: 2015, ISO 14001: 2004 y OHSAS 18001: 2007 para reducir los costos operativos de la empresa Fox Wagen Motor Sport S. A. C [Tesis]. PE: Universidad Privada del Norte; 2018. https://hdl.handle.net/11537/13191
@misc{sunedu/2804176,
title = "Propuesta de un sistema integrado de gestión de calidad, medio ambiente y seguridad y salud ocupacional en base a las normas ISO 9001: 2015, ISO 14001: 2004 y OHSAS 18001: 2007 para reducir los costos operativos de la empresa Fox Wagen Motor Sport S. A. C",
author = "Nomberto Durán, Estuardo Alonso",
publisher = "Universidad Privada del Norte",
year = "2018"
}
The main objective of this work was to reduce the operating costs of the company FOX WAGEN MOTOR SPORT SAC through the proposal of an Integrated Quality, Environment and Safety and Occupational Health Management System based on ISO 9001: 2015, ISO 14001: 2004 and OHSAS 18001: 2007 to reduce the operating costs of the company FOX WAGEN MOTOR SPORT SAC. First, a diagnosis was made of the current situation of the company focused on each area of the trinomory, identifying and analyzing the root causes of the problems. Once the stage of identifying the causes of the problems was completed, the prioritization of the people was carried out using the Pareto diagram to take the step to determine the economic impact generated by these problems in Monetarias. In addition, a detail of the company's service process is explained as well as the type of equipment required for the process and the tools that are used. The detailed work project was the improvements such as the MRP system, the 5S tool, the Kardex, the EOQ, among others were evaluated economically and financially. The improvement proposal that offers products with development procedures, standardized formats that allow to control the production processes and the adequate management of warehouses and inventories. Finally and with all the information analyzed and collected; and from the diagnosis that has been prepared, an analysis of the results and the discussion is presented to corroborate with the quantitative data the evidences presented and the improvement achieved with the implementation of an Integrated Management System.
This item is licensed under a Creative Commons License