Bibliographic citations
Benites, J., Goicochea, R., Ríos, E. (2014). Estudio de prefactibilidad para la instalación de una planta industrial de fruta confitada a partir del fruto de pepino (Cucumis sativus l.) en la región Loreto [Tesis, Universidad Nacional de la Amazonía Peruana]. http://repositorio.unapiquitos.edu.pe/handle/20.500.12737/4139
Benites, J., Goicochea, R., Ríos, E. Estudio de prefactibilidad para la instalación de una planta industrial de fruta confitada a partir del fruto de pepino (Cucumis sativus l.) en la región Loreto [Tesis]. : Universidad Nacional de la Amazonía Peruana; 2014. http://repositorio.unapiquitos.edu.pe/handle/20.500.12737/4139
@misc{renati/968948,
title = "Estudio de prefactibilidad para la instalación de una planta industrial de fruta confitada a partir del fruto de pepino (Cucumis sativus l.) en la región Loreto",
author = "Ríos Valdivia, Elizabeht Milagros",
publisher = "Universidad Nacional de la Amazonía Peruana",
year = "2014"
}
In the present work, carried out a market study in the Loreto region, determined a unmet demand of 3.96 MT/yr. by 2015. It established a plant size of 44.00 MT/yr which will require 80.00 MT/yr of fruits of cucumber (Cucumis sativus L. ) which is equivalent to the production of 15.5 hectares of cultivation and its location is located in the province of Maynas , district of San Juan Bautista 27km road Iquitos - Nauta. They took stock of the field in each stage of the production process determined that for every round in the process (8 hour shift), should be enter 38.41 kg/shift of fruits of cucumber (Cucumis sativus L. ). To get 22.00 Kg of jammy fruit, obtaining a yield of 57 %. In the same way calculations were performed for consumption and energy losses in each unit operation estimating that for a batch of production (a shift) the total consumption of steam is 0.219 Kg/s. Calculations are performed for the design and specification of the main and auxiliary equipment. The calculations were limited to the established infrastructure and machinery default. It was determined the total investment of the project amounts to U. S$ 93 573.56 which will be financed by COFIDE (PROPEM - CAF) - BANCO CONTINENTAL up to an amount that amounts to U. S$ 84 216.20. Assessed technically and economically the project yielded the following results: VAN U. S$ 14 293.22; TIR U. S$ 15.51 % and cost/benefit ratio (B/C) of 1.15 was also determined that the recovery period of investment will be 4.18 years.
This item is licensed under a Creative Commons License