Title: Evaluación y diseño hidráulico para reubicación del canal lateral de primer orden Barbadillo, tramo km.0+167 al 0+404
Advisor(s): Rodriguez Silva, Gustavo Eduardo Andres
OCDE field: https://purl.org/pe-repo/ocde/ford#1.05.11
Issue Date: 2023
Institution: Universidad Nacional Agraria La Molina
Abstract: Es fundamental reconocer la importancia de los proyectos de sistemas de riego, ya que el recurso hídrico es importante en el desarrollo productivo y económico del país. Por ello, las Juntas de Usuarios de Agua, cuyas responsabilidades están definidas en la Ley de Recursos Hídricos (Ley N° 29338), deben evaluar la calidad de los servicios que brindan y el estado de su infraestructura hidráulica para desarrollar, promover o gestionar soluciones alternativas en caso de afectaciones en un sector hidráulico específico. Por ello, el presente trabajo monográfico se enfocó en la evaluación del estado actual de la infraestructura hidráulica con el propósito de su reubicación, así como en la elaboración de un estudio de diseño hidráulico, que fue realizado por la suscrita en el año 2022. El cual se llevó a cabo en el marco del proyecto "Construcción de canal entubado en la Asociación de Propietarios de Vivienda Villa Vitarte para el desvío de un canal existente" en el tramo comprendido entre la Carretera Central Km. 7.5 y la Av. Marco Puente Llanos en el distrito de Ate, provincia y departamento de Lima, perteneciente a la Junta de Usuarios del Sector Hidráulico Rímac y tuvo como objetivo restaurar la operatividad, la distribución del agua para el riego de áreas verdes y la prevención de riesgos asociados a desbordes que podrían afectar las estructuras del pozo de ventilación PV-26 del proyecto de la Línea 2 del Metro de Lima.

It is essential to recognize the importance of irrigation system projects, since water resources are important in the productive and economic development of the country. Therefore, the Water User Boards, whose responsibilities are defined in the Water Resources Law (Law No. 29338), must evaluate the quality of the services they provide and the state of their hydraulic infrastructure to develop, promote or manage solutions. alternatives in case of damages in a specific hydraulic sector. Therefore, this monographic work focused on the evaluation of the current state of the hydraulic infrastructure with the purpose of its relocation, as well as the preparation of a hydraulic design study, which was carried out by the undersigned in 2022. Which was carried out within the framework of the project "Construction of a piped canal in the Villa Vitarte Homeowners Association for the diversion of an existing canal" in the section between Carretera Central Km. 7.5 and Av. Marco Puente Llanos in the district of Ate, province and department of Lima, belonging to the Board of Users of the Rímac Hydraulic Sector and aimed to restore operation, the distribution of water for the irrigation of green areas and the prevention of risks associated with overflows that could affect the structures of the PV-26 ventilation shaft of the Lima Metro Line 2 project.
Note: Universidad Nacional Agraria La Molina. Facultad de Ingeniería Agrícola. Departamento Académico de Ordenamiento Territorial y Construcción
Discipline: Ingeniería Agrícola
Grade or title grantor: Universidad Nacional Agraria La Molina. Facultad de Ingeniería Agrícola
Grade or title: Ingeniero Agrícola
Juror: Velásquez Bejarano, Teresa Olinda; García Armas, Juvenal Viviano; Torres Murga, Saúl Moises
Register date: 13-Feb-2024