Look-up in Google Scholar
Full metadata record
Uehara Yagi, Jose Daniel
Figueroa Zárate, Elisa Angelina
Gómez Surichaqui, Giankarlo Rodolfo
Vidangos Delgado, Kenny
Zavaleta Rodríguez, Wilin Alexander
Galván Aldoradín, Cristopher Jean Pierre
2022-07-26T22:31:54Z
2022-07-26T22:31:54Z
2021-09-03
http://hdl.handle.net/10757/660437
Pretender conseguir resultados distintos con las mismas estrategias, es insania. Como dijo Einstein “Locura es hacer la misma cosa una y otra vez y esperar diferentes resultados.” Si avanzar es un imperativo y no hacerlo de la misma forma es una necesidad, mantener el statu quo de los contratos, así como la forma de planificarlos y ejecutarlos solo resultará en una ingente pérdida de tiempo y dinero. Hoy más que nunca, en un escenario pandémico que no tiene fecha cierta de conclusión, y en un entorno de constante cambio normativo, el costo de trabajar de forma desconfiada, poco transparente, no integrada tendrá como resultado una pérdida de eficiencia para todos en la industria de la construcción. Nuestra investigación postula que, el escenario de crisis actual también puede ser visto como un escenario de oportunidad. Oportunidad de probar y generar entornos de gestión colaborativa de proyectos empleando el Virtual Design and Construction. Proyectos en los que, sin perjuicio de su sistema de entrega de proyecto, se pueda integrar de manera eficiente tanto la revisión de los procesos, planificación de los trabajos, los métodos constructivos y reorganización de los recursos sin dejar de lado una transparente gestión y control de los costos que permitan reducir o controlar la pérdida de los proyectos afectados por la pandemia del COVID-19. En un mercado que hasta hace poco competía de manera descarnada canibalizando la utilidad e incrementando las contingencias y montos de reserva, por riesgos que no necesariamente se encuentran asignados a la parte más preparada para afrontarlos; es preciso generar conocimiento sobre el empleo de herramientas como el VDC, que permitan viabilizar la conclusión de los proyectos y reactivar la actividad económica del país. (es_PE)
Trying to achieve different results with the same strategies is crazy, because as Einstein says "Insanity is doing the same thing over and over again and expecting different results." If moving forward is an imperative and not doing it, in the same way, is a necessity, maintaining the status quo of contracts, as well as the way to plan and execute them, will only result in a considerable waste of time and money. Today more than ever, in a pandemic scenario that does not have a specific end date, with an environment of constant regulatory change, the cost of working in a distrustful, non-transparent, and non-integrated way will result in a loss of efficiency for everyone in the Construction Industry. Our research postulates that the current crisis scenario can also be an opportunity. An Opportunity to prove and generate collaborative project management environments using Virtual Design and Construction. Projects in which, without prejudice to the project delivery system, the review of processes, work planning, construction methods and reorganization of resources can be efficiently integrated without neglecting transparent management of costs that reduce the loss of projects affected by the COVID-19 pandemic. In a market that competes fiercely, cannibalizes profits and increases contingencies and reserve amounts, it is necessary to generate knowledge about the use of tools such as VDC, which allow the completion of projects to be made feasible and to reactivate the country's economic activity. (es_PE)
Trabajo de investigación (es_PE)
application/pdf (es_PE)
application/epub (es_PE)
application/msword (es_PE)
spa (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
info:eu-repo/semantics/openAccess (es_PE)
http://creativecommons.org/licenses/by-nc-sa/4.0/ (*)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
Repositorio Académico - UPC (es_PE)
Gestión colaborativa (es_PE)
Eficiencia de procesos (es_PE)
Virtual Design and Construction (es_PE)
COVID-19 (es_PE)
Collaborative management (es_PE)
Process efficiency (es_PE)
Aplicación del Virtual Design and Construction (VDC) como método de gestión colaborativa para mitigar el impacto en costo y tiempo por el COVID-19 en el proyecto inmobiliario Edificio Multifamiliar Optimo (es_PE)
Application of Virtual Design and Construction (VDC) as a collaborative management method to mitigate the impact on cost and time due to COVID-19 in the Optimal Multifamily Building real estate project (es_PE)
info:eu-repo/semantics/masterThesis (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC). Escuela de Postgrado (es_PE)
Maestría en Dirección de la Construcción (es_PE)
Maestría (es_PE)
Maestro en Dirección de la Construcción (es_PE)
PE (es_PE)
https://purl.org/pe-repo/ocde/ford#2.01.03 (es_PE)
https://purl.org/pe-repo/renati/level#maestro (es_PE)
https://orcid.org/0000-0002-9190-6443 (es_PE)
732167
https://purl.org/pe-repo/renati/type#trabajoDeInvestigacion
Privada societaria



This item is licensed under a Creative Commons License Creative Commons