Bibliographic citations
Huaman, E., Campos, M. (2023). Propuesta para la Gestión de cambios de alcance dentro de un enfoque de Contratos NEC Opción F para que los proyectos de Carretera administradas por Provias Nacional se entreguen en el menor plazo, caso de estudio: Construcción de la Vía Evitamiento a la Ciudad de Abancay [Trabajo de investigación, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/672994
Huaman, E., Campos, M. Propuesta para la Gestión de cambios de alcance dentro de un enfoque de Contratos NEC Opción F para que los proyectos de Carretera administradas por Provias Nacional se entreguen en el menor plazo, caso de estudio: Construcción de la Vía Evitamiento a la Ciudad de Abancay [Trabajo de investigación]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2023. http://hdl.handle.net/10757/672994
@mastersthesis{renati/931797,
title = "Propuesta para la Gestión de cambios de alcance dentro de un enfoque de Contratos NEC Opción F para que los proyectos de Carretera administradas por Provias Nacional se entreguen en el menor plazo, caso de estudio: Construcción de la Vía Evitamiento a la Ciudad de Abancay",
author = "Campos Barboza, Miguel",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2023"
}
This research analyses the current situation of a road project, with the aim of identifying the current situation and the main causes that generate the change of scope during the development of the work, which has allowed the project to present a low probability of success when administered under the contractual framework of the State Contracting Law. It also develops a general analysis of the National System of State Contracting for road construction projects administered by Provias Nacional, with the aim of comparing it with the NEC family of contracts. The main objective is to develop a proposal for the management of scope changes based on NEC4 option F contracts, with the aim of making road projects increase their probability of success and be completed in a shorter period than projects executed under the LCE, as it has already been shown that it is possible to execute the work in a shorter period and at a lower cost, as long as timely decisions are taken in the initial phase of the project to ensure a more efficient management. According to the proposal developed and the simulation of the project within a contractual framework of NEC 4 Option F, where it was concluded that the project can be managed more efficiently, taking decisions to reformulate and reconcile the file in the initial phase, where it is possible to verify that the work can be executed in a shorter time and at a lower cost, which shows that the NEC 4 Option F contracts have an advantage over the Law on State Contracting; however, it was found that the projects are delivered in a longer period and cost compared to those considered in the technical dossier.
This item is licensed under a Creative Commons License