Buscar en Google Scholar
Registro completo de metadatos
Bayona Carazas, Guillermo Anibal (es_PE)
Carrion Miguel, Pamela Stefany (es_PE)
Inocente Hurtado, Stefanny Pamela (es_PE)
Rojas Benito, Renzo Andree (es_PE)
Bayona Carazas, Guillermo Anibal (es_PE)
2024-09-05T22:21:42Z
2024-09-05T22:21:42Z
2024
Carrion, P., Inocente, S., Rojas, R. y Bayona, G. (2024). Optimization of the Stacking Process of Wire Mesh Coils in Industrial Processors. Tesis para optar el título profesional de Ingeniero Industrial, Escuela Académico Profesional de Ingeniería Industrial, Universidad Continental, Huancayo, Perú. (es_PE)
https://hdl.handle.net/20.500.12394/15387
This study proposes to optimise the post-production and storage process of electro-welded mesh rolls in companies in the city of Lima, for which this study has taken into account the entire production line and production of electro-welded mesh up to its storage, where the bottlenecks encountered occur when the final product is removed from the production line and taken to the warehouse. The forklift operator has to come constantly from time to time to lift the rolls two by two onto a rack and then take them to the warehouse with a total of 15 rolls, and this process is repeated every day. In the warehouse, the rolls are stacked two by two, all of which takes time and delays productivity. That is why the aim of this study is to analyse production, post-production and storage and to optimise to improve time, production and resource management. All this is achieved by using mathematical calculations, analysis software and finally an automatic machine is proposed, so that when the roll comes out of the winding machine, it is automatically stacked in the rack, once the 15 rolls are stacked, the conveyor belt moves the entire rack and only the forklift moves to the warehouse, being more productive since the racks will also be stackable. The results obtained in the analysis show that by implementing an automatic post-production and storage machine, the transfer and stacking times decrease significantly up to 76.76 % and the operational efficiency of the machine improves up to 79.35%, which benefits greatly and in the long term the entire production of this industrial line. (es_PE)
application/pdf (es_PE)
[3] páginas (es_PE)
eng (es_PE)
Universidad Continental (es_PE)
https://link.springer.com/chapter/10.1007/978-3-031-56373-7_9 (es_PE)
info:eu-repo/semantics/restrictedAccess (es_PE)
Universidad Continental (es_PE)
Repositorio Institucional - Continental (es_PE)
Electrosoldadura (es_PE)
Máquina (es_PE)
Optimization of the Stacking Process of Wire Mesh Coils in Industrial Processors (es_PE)
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Continental. Facultad de Ingeniería. (es_PE)
Ingeniería Industrial (es_PE)
Ingeniero Industrial (es_PE)
PE (es_PE)
https://purl.org/pe-repo/ocde/ford#2.11.04 (es_PE)
Pregrado presencial regular (es_PE)
https://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
07474656
https://orcid.org/0000-0001-6817-2085 (es_PE)
74074875
71231462
73474228
07474656
722026 (es_PE)
https://purl.org/pe-repo/renati/type#tesis (es_PE)
Privada societaria
info:eu-repo/semantics/publishedVersion (es_PE)



IMPORTANTE
La información contenida en este registro es de entera responsabilidad de la universidad, institución o escuela de educación superior que administra el repositorio académico digital donde se encuentra el trabajo de investigación y/o proyecto, los cuales son conducentes a optar títulos profesionales y grados académicos. SUNEDU no se hace responsable por los contenidos accesibles a través del Registro Nacional de Trabajos de Investigación – RENATI.