Citas bibligráficas
Ramirez, D., (2024). Costos unitarios y valorizaciones para determinar la rentabilidad de la empresa contratista minera Falcon, Pataz 2024 [Universidad Nacional de Trujillo]. https://hdl.handle.net/20.500.14414/22135
Ramirez, D., Costos unitarios y valorizaciones para determinar la rentabilidad de la empresa contratista minera Falcon, Pataz 2024 []. PE: Universidad Nacional de Trujillo; 2024. https://hdl.handle.net/20.500.14414/22135
@misc{renati/882008,
title = "Costos unitarios y valorizaciones para determinar la rentabilidad de la empresa contratista minera Falcon, Pataz 2024",
author = "Ramirez De La Cruz, Daniel Orlando",
publisher = "Universidad Nacional de Trujillo",
year = "2024"
}
The main objective of the research was to analyze unit costs and valuations to determine the profitability of the mining contractor Falcon S.A.C., Pataz 2024. It was concluded that costs influenced 84% and valuations 95% of the company's profitability, with January 2024 being the most profitable month. The methodology used was a non-experimental, descriptive correlational, cross sectional design of the applicative type. The population consisted of all the mining contractor companies that carry out deepening and exploration work in the CIA Minera Poderosa and the sample consisted of the mining contractor company Falcon SAC. To evaluate the statistical significance, the ANOVA test was applied, yielding an F value of 5.44, which exceeds the critical value of 5.14. The results obtained indicated that the unit cost of the mining cycle was 1326.99 soles per meter of advance, being 303.70, 405.98, 166.81, 361.98 and 88.52 soles/meter of advance in drilling and blasting, loading-carrying, extraction, support and ventilation, respectively. The total was 511627.38 soles in a total of 185.60 meters of progress in the period from October 2023 to January 2024. The valuations were 180996.10, 225728.14 and 350989.35 soles in November, December and January, respectively. Generating a total of 757713.59 soles. The company's profitability was 61069.17 soles in November, 56275.41 soles in December and 128741.63 soles in January 2024, generating a total profitability of 246086.21 soles. The study is significant because it provides a detailed analysis of costs and valuations in a mining contractor company, which allows identifying areas for improvement and maximizing profitability.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons