Bibliographic citations
Paredes, C., (2018). Análisis de costos en el proceso constructivo de un canal ubicado en el área protegida del Parque Nacional Huascarán – PNH, para el riego de áreas de cultivo en la localidad de Chiquian – Bolognesi - Ancash [Universidad Nacional de Trujillo]. https://hdl.handle.net/20.500.14414/21961
Paredes, C., Análisis de costos en el proceso constructivo de un canal ubicado en el área protegida del Parque Nacional Huascarán – PNH, para el riego de áreas de cultivo en la localidad de Chiquian – Bolognesi - Ancash []. PE: Universidad Nacional de Trujillo; 2018. https://hdl.handle.net/20.500.14414/21961
@misc{renati/879718,
title = "Análisis de costos en el proceso constructivo de un canal ubicado en el área protegida del Parque Nacional Huascarán – PNH, para el riego de áreas de cultivo en la localidad de Chiquian – Bolognesi - Ancash",
author = "Paredes Murga, Cristhian Robert",
publisher = "Universidad Nacional de Trujillo",
year = "2018"
}
ABSTRACT The construction process of Tucu-Chiquitán canal, located in the protected natural area of Huascaran National Park, it presented various factors that influenced in its development and projected costs, this due to being in an especial escenary, character rigorous environmental guidelines were respected. Also, the components of ítems that defined the final unit cost were standerized, didn’t exist a detail evaluation of the acces an the real situation and socially the Project were exposed to the benefit poblation, but not thoroughly aware. The problematic on the basis arises by those involved that produce and those improve this type of project and other accompanying documents; for this, this investigation analizaded in detail the costs for the construction process of the canal, evidencing the remarkable economic variations that arose in relation to the projected, it was considered to describe three costs overruns generated of hight relevance: treatment wetlands, rural freight and social impact, for this costs calculations were done by linear meter of the canal with treatment wetlands, took data field and calculated the additional freight charge of great need in the absence of roads, and at last deepens the social problems that arose due to the not acceptance of a part of project; the final result describes the the cost overrruns represent an increase of 2 % of total cost of project, approximately valued at 400 thousand soles. Finally, all this allowed concluded and recomend, the consideration of the analyzes for this contruction process in similar irrigation projects located in protected natural áreas.