Look-up in Google Scholar
Title: Diseño de la infraestructura hidráulica y riego por aspersión para pequeñas parcelas, en el caserio de Querobal, del Distrito de Curgos, Provincia Sánchez Carrión – La Libertad
Advisor(s): Villanueva Sánchez, Jorge Arturo
OCDE field: https://purl.org/pe-repo/ocde/ford#4.00.00
Issue Date: 2018
Institution: Universidad Nacional de Trujillo
Abstract: La tesis denominada: “Diseño de la infraestructura hidráulica y riego por aspersión para pequeñas parcelas, en el Caserío de Querobal, del Distrito de Curgos, Provincia Sánchez Carrión – La Libertad”, tiende en un futuro ser un proyecto productivo y sostenible que involucra 21,6 hectáreas de las familias identificadas y aptas para el proyecto y que conlleva a mejorar la condición de vida de 12 familias siendo un total de 66 personas que se benefician. Para el proyecto, se ha creído conveniente, considerar sólo una oferta de agua, para todos los manantiales, esto debido a que el costo por Ha, resulta alto, para atender a uno o dos beneficiarios que tienen mayor disponibilidad por lo tanto; se ha estandarizado el caudal ofertado, por ende el área bajo riego, a fin de que el apoyo a cada agricultor sea el mismo, en cuanto a área de producción. El proyecto consta del diseño de la toma de captación y se conectará a la línea de conducción por el cual se llevarán las aguas hacia el reservorio el cual se construirá a tajo abierto y será impermeabilizado con geomembrana de HDPE, con un espesor de 0,75 mm, con un volumen neto de diseño de 9 m3, su tiempo de llenado durará 10 horas aproximadamente. Para efectos del proyecto se ha reducido la frecuencia a 1 día, por lo tanto este reservorio proveerá de agua al sistema por un periodo de 7 días consecutivos. La red de distribución, conducirá el agua desde la salida del reservorio al hidrante de cada uno de los sectores de riego. La inversión para las 12 familias asciende a S/. 22 108,24.

ABSTRACT The thesis called: "Design of hydraulic infrastructure and sprinkler irrigation for small plots, in Caserío de Querobal, Curgos District, Sánchez Carrión Province - La Libertad", tends in the future to be a productive and sustainable project that involves 21, 6 hectares of families identified and eligible for the project and that leads to improve the living conditions of 12 families, with a total of 66 people benefiting. For the project, it has been considered convenient to consider only one water supply, for all the springs, this because the cost per hectare is high, to attend to one or two beneficiaries who have greater availability therefore; the flow offered has been standardized, therefore the area under irrigation, so that the support to each farmer is the same, in terms of production area. The project consists of the design of the catchment and will be connected to the line of conduction through which the water will be taken to the reservoir which will be built with open pit and will be waterproofed with HDPE geomembrane, with a thickness of 0.75mm, with a net design volume of 9 m3, its filling time will last approximately 10 hours. For the purposes of the project the frequency has been reduced to 1 day, therefore this reservoir will provide water to the system for a period of 7 consecutive days. The distribution network will direct the water from the outlet of the reservoir to the hydrant of each of the irrigation sectors. The investment for the 12 families amounts to S /. 22 108,24.
Discipline: Ingenieria Agricola
Grade or title grantor: Universidad Nacional de Trujillo. Facultad de Ciencias Agropecuarias
Grade or title: Ingeniero Agricola
Juror: Carrasco Silva, Anselmo Humberto; Arteaga Caro, Pavel Ovidio; Cabanillas Agreda, Carlos Alberto
Register date: 5-Aug-2024



This item is licensed under a Creative Commons License Creative Commons