Bibliographic citations
Cerrón, N., (2021). Implementación de un sistema informático para mejorar los procesos de gestión de incidencias en el proyecto del túnel Néstor Gambetta de la provincia constitucional del Callao - 2020 [Universidad Tecnológica del Perú]. https://hdl.handle.net/20.500.12867/4600
Cerrón, N., Implementación de un sistema informático para mejorar los procesos de gestión de incidencias en el proyecto del túnel Néstor Gambetta de la provincia constitucional del Callao - 2020 []. PE: Universidad Tecnológica del Perú; 2021. https://hdl.handle.net/20.500.12867/4600
@misc{renati/810662,
title = "Implementación de un sistema informático para mejorar los procesos de gestión de incidencias en el proyecto del túnel Néstor Gambetta de la provincia constitucional del Callao - 2020",
author = "Cerrón Ruíz, Nilo Ricardo",
publisher = "Universidad Tecnológica del Perú",
year = "2021"
}
The implementation shown below is the analysis and design of a solution using the RUP Methodology (Rational Unified Process), forthis an Incident Management System was implemented in the operations area of the Néstor Gambetta Tunnel project that can collect, store and manage information.From the beginning we identified the problems that originate in the control center, they wereexplained in detail by identifying the obvious causes, where the lagged response time to events or incidence in the operation was substantially considerable and is a very important indicator to propose an automated incident management system.After finding the respective sustenance, the general and specific objectives were defined. To give way to the corresponding theoretical framework helping to understand each concept that was needed in the implementation.In the chapter on the development of the implementation, it is detailed how to apply good programming practices and the knowledge acquired in the career on the RUP methodology, taking as a reference its 4 phases: Initiation, elaboration, construction and transition, adapting the knowledge and being ableto achieve the success of the ongoing project.Finally, in Chapter 4, the implementation measurements are shown through the comparative tables, the client being satisfied with the reduction in costs and staff time, in addition to guaranteeing the reliability of the information through statistical reports.
This item is licensed under a Creative Commons License