Maylle, A., (2023). Procedimiento constructivo de la reubicación de redes de agua potable y alcantarillado para la liberación de interferencias del Metro mediante la intervención de la Estación Gambetta y Poza de Ataque, Callao [Trabajo de suficiencia profesional, Universidad Nacional de Ingeniería]. http://hdl.handle.net/20.500.14076/27434
Maylle, A., Procedimiento constructivo de la reubicación de redes de agua potable y alcantarillado para la liberación de interferencias del Metro mediante la intervención de la Estación Gambetta y Poza de Ataque, Callao [Trabajo de suficiencia profesional]. PE: Universidad Nacional de Ingeniería; 2023. http://hdl.handle.net/20.500.14076/27434
@misc{renati/713061,
title = "Procedimiento constructivo de la reubicación de redes de agua potable y alcantarillado para la liberación de interferencias del Metro mediante la intervención de la Estación Gambetta y Poza de Ataque, Callao",
author = "Maylle Ambrocio, Adonis Glen",
publisher = "Universidad Nacional de Ingeniería",
year = "2023"
}
The construction of the Gambetta E-01 underground station on Branch 4 of Line 2 of the Lima Metro on Elmer Faucett Avenue involves the relocation of the existing water and sewage networks, with the aim of diverting their route to be within the concession area of the Gambetta Station and Poza de Ataque of the electric train. It should be noted that while the new water and sewage networks were being executed to free interference from the Gambetta E-01 Station and Poza de Ataque, the sanitation service was provided normally, with the flow operating without interruptions; For this purpose, provisional works were carried out in the sewage system. The sanitary sewage was executed using conventional methodology and trenchless methodology using a liner tunnel in three (03) sections located in the 200 Mile Oval of Callao. The tunnel lining system is a corrugated steel system used for the construction of tunnels without the need to make open trenches, avoiding the interruption of the development of surface activities during the execution of the work. The new relocated primary collector was connected to the North Interceptor, in the existing mailbox Bz-304261 that enters the Taboada WWTP, located between Nestor Gambetta and Elmer Faucett avenues in Callao. During the execution of the work, appropriate procedures were applied for the relocation of the networks, taking into account the SEDAPAL Technical Specifications, project technical specifications, international technical standards and manufacturers' recommendations.