Bibliographic citations
Pichis, B., (2022). Desarrollo de la ingeniería básica de la nueva línea de transmisión en 60 KV Zorritos-Tumbes [Trabajo de suficiencia profesional, Universidad Nacional de Ingeniería]. http://hdl.handle.net/20.500.14076/26614
Pichis, B., Desarrollo de la ingeniería básica de la nueva línea de transmisión en 60 KV Zorritos-Tumbes [Trabajo de suficiencia profesional]. PE: Universidad Nacional de Ingeniería; 2022. http://hdl.handle.net/20.500.14076/26614
@misc{renati/712701,
title = "Desarrollo de la ingeniería básica de la nueva línea de transmisión en 60 KV Zorritos-Tumbes",
author = "Pichis Torres, Beans Javier",
publisher = "Universidad Nacional de Ingeniería",
year = "2022"
}
In this paper, the basic engineering of the new transmission line that links the Zorritos substation and the Tumbes substation is developed, due to the increased load maintained by the cities of Tumbes, Puerto Pizarro and Zarumilla due to shrimp activities throughout of its coasts and the growth of its population. The project foresees the exit from a new compact hybrid cell in 60 kV of the SET Zorritos, leaving underground with power cables for a section of 120 meters until reaching the first structure of the new line to Zorritos, then the trace continue looking for an approach on the east side of the line and parallel to the TL 60kV Zorritos - Tumbes exists and enters the Tumbes SET from the east side, passing underground in a 250-meter section and continuing the last 130 meters aerially to enter the Line to the 60 kV gantry of the substation. It should be noted that by implementing the underground line in the section of entry to the Tumbes SET, it would not affect the existing Tumbes - Puerto Pizarro line. From the analysis of the electrical system, with the entry of the project, the chargeability of the existing transmission line would be reduced, the tensions in the busbars would be improved and the power losses would be reduced, which would have a greater reliability in the service. There is a projection horizon of more than 30 years for the electricity market, in order to have a vision that allows better decisions to be made in the long term.