Title: Mejora del beneficio económico incrementando el ángulo interrampa y aplicando voladura controlada de rocas en una mina a tajo abierto
Advisor(s): Guarniz Anticona, Sandro Germán
OCDE field: http://purl.org/pe-repo/ocde/ford#2.07.05
Issue Date: 2021
Institution: Universidad Nacional de Ingeniería
Abstract: La literatura ha venido demostrando que el incremento del ángulo interrampa/global en taludes finales en minas a tajo abierto genera una disminución del stripping ratio lo cual se traduce en mayor aporte de mineral y un posible incremento en la vida de la mina en su etapa final. Esta técnica de empinamiento de taludes se aplicó en la mina ABC durante el año 2019, se trabajó con datos entre los meses de enero a agosto siendo estas principalmente: topografías reales a cierre de mes, polígonos de mineral y desmonte de la mina ABC. Las topografías se procesaron en los softwares SLIDE 6.0 para hallar el factor de seguridad del talud. Para el cálculo de tonelajes de mineral y desmonte en las diferentes alternativas se utilizó el software Q’pit, para la realización de secciones y ploteo se utilizó el software MineSight ® versión 8.10 para el cálculo del beneficio económico se realizaron análisis comparativos de VPN, TIR y B/C. Se finalizó el proyecto sin ningún problema de estabilidad en el talud, donde el factor de seguridad estático en el sector con mayor empinamiento esta sobre 2.33, y luego de la aplicación de voladura controlada de rocas se aumentó el beneficio económico en 1.3 millones de dólares medidos a través del VPN, se incrementó el TIR en 9% y el B/C en 49%.

The literature has come to demonstrate that the increase of the inter-ramp / global angle in final slopes in open pit mines generates a decrease in the stripping ratio which translates into a greater contribution of ore and a possible increase in the life of the mine in its final stage. This slope steepness technique was applied in the ABC mine during the year 2019, it was specified with data between the months of January to August, these being mainly: real topographies at the end of the month, ore polygons and dismantling of the ABC mine. Topographies are processed in SLIDE 6.0 software to find the slope safety factor. For the calculation of mineral tones and disassemble in the different alternatives, select the Q'pit software, for the realization of sections and plotting, select the software MineSight ® 8.10 for the calculation of the economic benefit in the comparative analysis of VPN, IRR and B / C. The project was completed without any stability problem on the slope, where the static safety factor in the sector with the highest steepness is above 2.33, and after the application of controlled rock blasting, the economic benefit was increased by 1.3 million dollars measured Through the VPN, the IRR increased by 9% and the B / C by 49%.
Discipline: Maestría en Gestión Minera
Grade or title grantor: Universidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgica. Unidad de Posgrado
Grade or title: Maestro en Gestión Minera
Juror: Landauro Abanto, Alberto; Valverde Espinoza, Santiago Gualberto; Corimanya Mauricio, José Antonio; Castillo Alejos, Efraín Eugenio
Register date: 24-Aug-2022