Monge, J., (2021). Mejoras en el mantenimiento de las redes externas de gas natural, mediante la implementación de un sistema de control en la ciudad de Lima y Callao [Tesis, Universidad Nacional de Ingeniería]. http://hdl.handle.net/20.500.14076/22271
Monge, J., Mejoras en el mantenimiento de las redes externas de gas natural, mediante la implementación de un sistema de control en la ciudad de Lima y Callao [Tesis]. PE: Universidad Nacional de Ingeniería; 2021. http://hdl.handle.net/20.500.14076/22271
@misc{renati/711809,
title = "Mejoras en el mantenimiento de las redes externas de gas natural, mediante la implementación de un sistema de control en la ciudad de Lima y Callao",
author = "Monge Poma, Jesús Omar",
publisher = "Universidad Nacional de Ingeniería",
year = "2021"
}
The present research work, prepared under the thesis modality, of execution in order to improve maintenance in the Natural Gas distribution networks of Lima and Callao, through the implementation of a control system, a Gas distribution network Natural comprises two types of pipe, among them we have: those of polyethylene and those of steel. Currently there are 2 types of maintenance in which verification and repair activities are carried out, with the aim of preserving the good working order of the distribution networks, as well as analyzing productivity and costs. There is a maintenance manual approved by Osinergmin (Supervisory Agency for Investment in Energy and Mining), but there are still many complaints and observations from customers, therefore they cannot reach their objective. At the moment, the ideas technique is being used to analyze objectively and prioritize according to the incidence with which they are presented. Information was collected for 9 weeks from January, February and March 2020. On the other hand, an evaluation was carried out with the company Enermin Audi is a company that performs supervision of network construction with a projected monthly income of $ 37,500.00, the first 3 months and the 4th month there will be an increase of $ 3,000 dollars. On the other hand, if the implementation of a control system is carried out in Enermin Audi there will be an increase of $ 11, 331.70 with an economic analysis is satisfactory with NPV: of $ 29,700.13 dollars and the IRR with 36%, the latter indicates that the implementation it is satisfactory.