Look-up in Google Scholar
Title: Remoción de iones cromo, níquel y zinc de efluentes de la industria galvánica usando técnica de electrocoagulación
Advisor(s): Cárdenas Mendoza, Teodardo Javier
OCDE field: http://purl.org/pe-repo/ocde/ford#2.04.01
Issue Date: 2018
Institution: Universidad Nacional de Ingeniería
Abstract: Muchas Industrias dedicadas al recubrimiento metálico generan efluentes industriales con alto grado de metales pesados, con potencial daño al medio ambiente y a la salud. La empresa dedicada a este rubro industrial envía sus efluentes industriales hacia un relleno sanitario industrial mediante una empresa tercera. No obstante, está en búsqueda de una alternativa para tratar el efluente industrial, minimizando la presencia de metales pesados como cromo, níquel y zinc para luego ser vertido al sistema de alcantarillado, cumpliendo la normativa vigente. En este estudio se planteó tratar el efluente industrial mediante la técnica de electrocoagulación. Para tener resultados previos al tratamiento del efluente, se realizó ensayos experimentales con una muestra sintética bajo un sistema por lotes y otro sistema continuo cuyo contenido para ambos está conformado por los iones Cromo (+6), Níquel (+2) y Zinc (+2) con el fin de establecer parámetros de operación como pH, temperatura, tiempo y Densidad de Corriente; mostrar resultados como porcentaje de remoción de los metales a estudio, conductividad y sólidos totales. Los valores óptimos de operación que se obtuvieron con la muestra sintética bajo un sistema por lotes fueron con una intensidad de corriente i=166.7 A/m2, con un pH máximo de 7.90 y un tiempo de tratamiento de 20 minutos, cuyos porcentajes de remoción fueron 100% para los 3 iones en estudio. Al tratar la muestra sintética a 166.7 A/m2 mediante el sistema continuo con un flujo de 50 mL/min, con un pH máximo de 7.80 y un tiempo de tratamiento de 30 minutos, se obtuvieron los porcentajes de remoción de 97.8% de Cr +6, 99,7% de Ni 2+y 99.5% de Zn2+, cumpliendo con la normativa vigente del país. Al aplicar estos parámetros de operación óptimos al efluente real se obtuvieron los siguientes resultados; en el sistema por lotes se removió 99.2% de Cr +6, 97,7% de Ni 2+y 95.0% de Zn2+, y en el sistema continuo se removió 97.9% de Cr +6, 96.4% de Ni 2+y 93.6% de Zn2+, y también cumpliendo con la normativa legal vigente para el vertimiento al sistema de alcantarillado.

Many industries engaged in metal coating generate industrial effluents with a high degree of heavy metals, with potential damage to the environment and health. The company dedicated to this industrial area sends its industrial effluents to an industrial sanitary landfill through a third company. However, it is looking for an alternative to treat the industrial effect, minimizing the presence of heavy metals such as zinc, nickel and chromium and then be discharged to the sewer system, complying with current regulations. In this study it was proposed to treat the industrial effluent by the electrocoagulation technique. To have previous results to the treatment of the effluent, experimental tests were carried out with a synthetic sample under a batch system and another continuous system whose content for both is formed by the Chromium (+6) , Nickel (+2) and Zinc (+2) in order to establish operating parameters such as pH, temperature, time and current density; show results as percent removal of the metals under study, conductivity and total solids. The optical values of operation that were obtained with the synthetic sign under a system by the lots were with a current intensity, with a pH of 7,90 and a treatment time of 20 minutes, whose percentages of removal were 100% for all metals. In treating the synthetic sample with the continuous system, the values were obtained with a current intensity 166.7 A/m2, with a flow of 50 ml/min, with a pH of 7.80 and a treatment time of 30 minutes, whose percentages of removal were 97.8% of Cr +6, 99,7% of Ni 2+ and 99.5% de Zn2+. For systems compliant with current regulations of the country. By applying these optimum operating parameters to the effect, the following results were obtained; 99.2% of Cr +6, 97,7% of Ni 2+ and 95.0% de Zn2+ were removed in the batch system and 97.9% of Cr +6, 96.4% of Ni 2+ and 93.6% de Zn2+ were removed in the continuous system. Thus, in all systems has been complied with the current regulations for the dumping of the sewerage system
Discipline: Ingeniería Química
Grade or title grantor: Universidad Nacional de Ingeniería. Facultad de Ingeniería Química y Textil
Grade or title: Ingeniero Químico
Juror: Pizarro Solís, Pedro Arturo; Reátegui Romero, Warren
Register date: 31-Oct-2018



This item is licensed under a Creative Commons License Creative Commons