Bibliographic citations
This is an automatically generated citacion. Modify it if you see fit
Arias, J., (2016). Planeamiento estratégico del servicio de ventilación principal mina Huaron [Tesis, Universidad Nacional de Ingeniería]. http://hdl.handle.net/20.500.14076/4584
Arias, J., Planeamiento estratégico del servicio de ventilación principal mina Huaron [Tesis]. : Universidad Nacional de Ingeniería; 2016. http://hdl.handle.net/20.500.14076/4584
@misc{renati/707377,
title = "Planeamiento estratégico del servicio de ventilación principal mina Huaron",
author = "Arias Campos, José Luis",
publisher = "Universidad Nacional de Ingeniería",
year = "2016"
}
Title: Planeamiento estratégico del servicio de ventilación principal mina Huaron
Authors(s): Arias Campos, José Luis
Advisor(s): Hidalgo Mendieta, Fidel Julio
Issue Date: 2016
Institution: Universidad Nacional de Ingeniería
Abstract: Se elaboró el Plan Estratégico de Servicios Ventilación Principal de Mina Huaron, donde se realizó una serie de revisiones al sistema de ventilación primario para garantizar la entrega de los caudales de aire fresco según la Norma Nacional, sin embargo al mismo tiempo significa disponer de un sistema de ventilación económicamente eficiente para satisfacer las futuras demandas de producción (2016-2020). Durante la validación del modelo por computador (ver Sección 6.0), se encontró que en la actualidad Huaron tiene un promedio de 17,000 m3/min (~ 600,000 cfm) que entrega al interior de la mina, un déficit del 16% del ratio de ventilación de cumplimiento requerido; en las tablas 4.1a y 4.1b ilustran y resumen los esperados incrementos anuales de volumen de aire para los años de operación del 2016 hasta el 2020 en la Mina Huaron, para el cual se plantean dos alternativas de transporte de mineral que influirán en los volúmenes de aire fresco requeridos en este periodo de producción.
La Tabla 4.1a ilustra los requerimientos de aire para el personal y dilución del equipo accionado por diésel cuando se utilizan solamente camiones de transporte, la máxima tasa de ventilación requerida en Huaron se incrementa hasta 36,752 m3/min (~ 1, 298,000 cfm) en el año 2019. Los costos de inversión del desarrollo ($ 4, 586,000) para el sistema primario de ventilación reestructurado de Huaron para dar cabida a los máximos requerimientos de aire que han sido estimados con una precisión de +/-20 %, sin embargo dado los ahorros de energía proporcionados por la baja resistencia del sistema “Reestructurado”, la Tasa Interna de Retorno del proyecto se acerca a 23%.
The Strategic Plan Core Service Ventilation, where a number of revisions of Mina Huaron were made to the system of primary ventilation to ensure delivery of the flow of fresh air according to the National Standard was developed, yet at the same time means having a ventilation system economically efficient to meet the future demands of production (2016-2020). During the process of validating the computer model (see Section 6.0), it was found that currently Huaron has an average of 17,000 m3 / min (~600,000 cfm) delivering into the mine, a deficit of 16% of the ratio Ventilation required compliance; 4.1a and 4.1b in the tables illustrate and summarize the expected annual increases air volume operation for the years 2016 to 2020 in the Huaron Mina, for which two ore transportation alternatives that will influence volumes arising fresh air required production in this period. Investment costs of development ($ 4,586,000) for the primary ventilation system Huaron restructured to accommodate the maximum air requirement shave been estimated with an accuracy of +/- 20%, however given savings energy provided by the low resistance of the “Restructured“ system, the internal rate of return of the project is about 23%.
The Strategic Plan Core Service Ventilation, where a number of revisions of Mina Huaron were made to the system of primary ventilation to ensure delivery of the flow of fresh air according to the National Standard was developed, yet at the same time means having a ventilation system economically efficient to meet the future demands of production (2016-2020). During the process of validating the computer model (see Section 6.0), it was found that currently Huaron has an average of 17,000 m3 / min (~600,000 cfm) delivering into the mine, a deficit of 16% of the ratio Ventilation required compliance; 4.1a and 4.1b in the tables illustrate and summarize the expected annual increases air volume operation for the years 2016 to 2020 in the Huaron Mina, for which two ore transportation alternatives that will influence volumes arising fresh air required production in this period. Investment costs of development ($ 4,586,000) for the primary ventilation system Huaron restructured to accommodate the maximum air requirement shave been estimated with an accuracy of +/- 20%, however given savings energy provided by the low resistance of the “Restructured“ system, the internal rate of return of the project is about 23%.
Link to repository: http://hdl.handle.net/20.500.14076/4584
Discipline: Ingeniería de Minas
Grade or title grantor: Universidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgica
Grade or title: Ingeniero de Minas
Register date: 6-Sep-2017
This item is licensed under a Creative Commons License