Title: Implementaci?n de un sistema de gesti?n a trav?s del m?todo de resultado operativo en la obra: ?Camino Vecinal Salitral ? Huancabamba, tramo I: DV. R2A Salitral Bigote?
Advisor(s): Torres P?rez, Enrique L.
OCDE field: https://purl.org/pe-repo/ocde/ford#2.01.01
Issue Date: 2015
Institution: Universidad Ricardo Palma - URP
Abstract: Esta tesis presenta un enfoque cuantitativo, explicativo y descriptivo, aporta un sistema de gesti?n de costos mediante la metodolog?a del Resultado Operativo y las diferentes bondades que presenta para incrementar los niveles de control y planificaci?n de obra. En el desarrollo de una obra existen diferentes factores que afectan a la utilidad planificada, como atrasos en el cronograma, derroche de insumos, compras excesivas y otros que a la larga pueden terminar con dicha utilidad. Por este motivo contar con un sistema de control se vuelve vital para ejecutar una obra. El objetivo de esta tesis fue implementar el m?todo del Resultado Operativo a una obra civil, que permita tener en cuenta aquellos factores que afectan a la utilidad y as? incrementar el control de la misma, por ello se present? una base conceptual y el desarrollo de su metodolog?a. La metodolog?a propuesta permiti? planificar las partidas seg?n el cronograma de obra, optimizar los insumos, proyectar la utilidad a final de obra seg?n Fases y Grupos de Control establecidos, orientar a tomar decisiones anticipadas y mejorar el control de la utilidad en el transcurso de obra. This thesis present a quantitative, explanatory and descriptive approach, with the aim to provide a management costs system by operating income methodology and its various benefits presented to increasing control levels and planning work. In developing a work there are different factors that affect the planned utility, as delays in the schedule, wasted inputs, excessive shopping and others who may eventually end up with this utility. Therefore having a control system becomes vital to perform any work, either smaller or larger work, requires a control. The objective of this thesis is to implement the operating result method to a civil work, to take account factors that affect the utility, in order to increase control of it, so a conceptual base and develop methodology are discussed. The proposed methodology allows scheduling the work?s steps to optimize inputs, and project the utility at the end of work according to Control Groups and Established Phases, in order to make advance decisions and improve the control of the utility in the work?s development.
Discipline: Ingenier?a Civil
Grade or title grantor: Universidad Ricardo Palma. Facultad de Ingenier?a. Escuela Profesional de Ingenier?a Civil
Grade or title: Ingeniero Civil
Register date: 23-Aug-2019