Bibliographic citations
This is an automatically generated citacion. Modify it if you see fit
Chiriboga, M., Guerra, B. (2015). Aplicaci?n del PMBOK en la tuneler?a de miner?a subterr?nea [Tesis, Universidad Ricardo Palma - URP]. https://hdl.handle.net/20.500.14138/2223https://hdl.handle.net/20.500.14138/2223
Chiriboga, M., Guerra, B. Aplicaci?n del PMBOK en la tuneler?a de miner?a subterr?nea [Tesis]. PE: Universidad Ricardo Palma - URP; 2015. https://hdl.handle.net/20.500.14138/2223https://hdl.handle.net/20.500.14138/2223
@misc{renati/652932,
title = "Aplicaci?n del PMBOK en la tuneler?a de miner?a subterr?nea",
author = "Guerra Menacho, Bruno Germ?n",
publisher = "Universidad Ricardo Palma - URP",
year = "2015"
}
Title: Aplicaci?n del PMBOK en la tuneler?a de miner?a subterr?nea
Advisor(s): Vel?squez Jara, Arturo
Keywords: Gerencia de proyectos; Gesti?n del tiempo; Gesti?n de costos; Tuneler?a; Project management; Time management; Cost management; Tunneling
OCDE field: https://purl.org/pe-repo/ocde/ford#2.01.01
Issue Date: 2015
Institution: Universidad Ricardo Palma - URP
Abstract: La tesis propuesta es una investigaci?n cuantitativa de dise?o longitudinal, el objetivo de este estudio es implementar una metodolog?a de Gesti?n en proyectos en Tuneler?a Subterr?nea con similares caracter?sticas a la analizada. (SIMAREG S.R.L), que involucra los procesos de Gesti?n de Costos y Tiempo, tomando como referencia la Metodolog?a del Project Management Body of Knowledge (PMBOK), para el an?lisis, se identificaron los factores que afectan el cumplimiento de labores en la operaci?n, como tambi?n los m?todos de trabajo, y los sistemas de control; a este an?lisis se acompa?an propuestas que mejoran y/o complementan las entradas, herramientas y t?cnicas y salidas, con la finalidad de poder controlar y demostrar que el proyecto puede realizarse dentro del tiempo requerido as? como optimizar una adecuada distribuci?n de recursos y una reducci?n de los costos generando as? una mayor rentabilidad. The thesis proposal is a quantitative research and a longitudinal design, the objective of this study is to implement a project management methodology in Tunnelling Underground with similar characteristics to that analyzed. (SIMAREG SRL), involving processes about Costs and Time Management with reference to the methodology of the Project Management Body of Knowledge (PMBOK), for analyze, the factors affecting the performance of functions in the operation were identified as the working methods and control systems; this analysis proposals that enhance and / or complement the inputs, tools and techniques and outputs,, in order to be able to control and demonstrate that the project can be accomplished within the required time and optimize the appropriate distribution of resources and cost Reduction Generating support profitability.
Link to repository: https://hdl.handle.net/20.500.14138/2223; https://hdl.handle.net/20.500.14138/2223
Discipline: Ingenier?a Civil
Grade or title grantor: Universidad Ricardo Palma. Facultad de Ingenier?a. Escuela Profesional de Ingenier?a Civil
Grade or title: Ingeniero Civil
Register date: 20-Aug-2019
This item is licensed under a Creative Commons License