Bibliographic citations
Lovato, N., (2023). Proyecto de inversión privada para la instalación de una planta productora de mango orgánico en frío a cargo de productores del distrito de Pítipo, con destino a Tokio, 2022 [Universidad Católica Santo Toribio de Mogrovejo]. http://hdl.handle.net/20.500.12423/7140
Lovato, N., Proyecto de inversión privada para la instalación de una planta productora de mango orgánico en frío a cargo de productores del distrito de Pítipo, con destino a Tokio, 2022 []. PE: Universidad Católica Santo Toribio de Mogrovejo; 2023. http://hdl.handle.net/20.500.12423/7140
@misc{renati/583553,
title = "Proyecto de inversión privada para la instalación de una planta productora de mango orgánico en frío a cargo de productores del distrito de Pítipo, con destino a Tokio, 2022",
author = "Lovato Soto, Nicole Mariannele",
publisher = "Universidad Católica Santo Toribio de Mogrovejo",
year = "2023"
}
The objective of this study is to determine the feasibility of the installation of a cold organic mango production plant, which will be in charge of producers of the district of Pítipo to be exported to Tokyo, all this from the evaluation of market, technological, economic and financial feasibility. The main raw material used to manufacture the product will be national mango of the highest quality and recognition. This project is relevant because in recent years the price of this type of product has been increasing due to the growing demand for these products. That is why a previous research of organic mango, fruits from which the product will be elaborated, as well as the export of this product was carried out. After this, the organization of the company will be determined. To finally carry out the economic and financial study of the project, through which the feasibility of the project was determined with the help of indicators such as VAN and TIR. Through the scenarios shown, we were able to arrive at an expected scenario for the project, which has an Economic NPV of S/13,862,606.61 and a Financial NPV of S/15,123,434.59, IRR E of 56.53% and IRR F of 79.81%, B/C E of 2.9 and B/C F of 3.37. Thanks to these results we can conclude that the project is viable and feasible. With the present study we have obtained a Financial NPV of S/14,084,642.55, a Financial IRR of 79.81% with a COK of 18.17%, which shows that the project is profitable.