Risco, M., (2023). Lean manufacturing en el proceso de fabricación de trampa de sólidos y grasas para incrementar el nivel de servicio en la empresa S&E INOXI S. A. C [Universidad Católica Santo Toribio de Mogrovejo]. http://hdl.handle.net/20.500.12423/7129
Risco, M., Lean manufacturing en el proceso de fabricación de trampa de sólidos y grasas para incrementar el nivel de servicio en la empresa S&E INOXI S. A. C []. PE: Universidad Católica Santo Toribio de Mogrovejo; 2023. http://hdl.handle.net/20.500.12423/7129
@misc{renati/583532,
title = "Lean manufacturing en el proceso de fabricación de trampa de sólidos y grasas para incrementar el nivel de servicio en la empresa S&E INOXI S. A. C",
author = "Risco Llontop, Maria Jose",
publisher = "Universidad Católica Santo Toribio de Mogrovejo",
year = "2023"
}
The objective of this study was to increase the level of service in the company S & E INOXI S. A. C., which is dedicated to manufacturing and selling stainless steel furniture and provide maintenance services, since it was in a scenario of economic losses equivalent to S/. 28 470,00, due to the penalty of 5% for breach of the delivery date. Likewise, there were losses by raw material of S/. 96 905,03. The present work proposes an improvement of the productive system through the implementation of Lean Manufacturing tools to increase its level of service. This was achieved through the execution of a diagnosis of the current situation of the manufacturing process of solids and grease traps, evaluation and determination of the methods and / or engineering tools, followed by proposals for improvement of the process that would contribute to increase the level of service and finally the cost-benefit analysis of the project was carried out. As a result of the research, an increase of 23,1% in the level of service was obtained, the loss of raw material was reduced by 84,13%, this by means of the increase of 23,51% of the physical efficiency and it was achieved a decrease of 5,.87% of the distance traveled. In addition, the bottleneck was reduced by 10,64% and the process flow time by 9,88%. Also through the trainings and the OT diagram, the polyvalence of the operator was achieved, achieving a reduction of 67,41% of idle time for a batch of 3 units.