Bibliographic citations
Escarcena, C., (2024). Diseño de estrategia de mejora continua basada en la metodología PDCA para aumentar la productividad en una planta de ensamble de posición fija de maquinaria pesada [Pontificia Universidad Católica del Perú]. http://hdl.handle.net/20.500.12404/28740
Escarcena, C., Diseño de estrategia de mejora continua basada en la metodología PDCA para aumentar la productividad en una planta de ensamble de posición fija de maquinaria pesada []. PE: Pontificia Universidad Católica del Perú; 2024. http://hdl.handle.net/20.500.12404/28740
@mastersthesis{renati/537954,
title = "Diseño de estrategia de mejora continua basada en la metodología PDCA para aumentar la productividad en una planta de ensamble de posición fija de maquinaria pesada",
author = "Escarcena Peña, Cesar Augusto",
publisher = "Pontificia Universidad Católica del Perú",
year = "2024"
}
The current research work called “Design of continuous improvement strategy based on the PDCA methodology to increase productivity in a fixed position assembly plant of heavy machinery“ was carried out with an application case in the company Resemin S.A. due to the need to increase its productivity. Normally, those in charge of managing companies do not choose a fixed-position layout, this ends up being adopted due to the nature of the operations. Therefore, the disadvantages of this distribution are also adopted, so it is necessary to implement continuous improvement strategies to reduce these disadvantages, obtaining as the main benefit an increase in the productivity of the company. Therefore, the objective of this research is to propose a strategy that serves as a reference for other cases on how to carry out continuous improvement projects following the PDCA methodology in a fixed position plant, in this case the application was made in the company Resemin SA. To carry out the above, continuous improvement tools are applied such as: the analysis of the 5 whys, Ishikawa diagram, Process Analytical Diagram (DAP), 5W 2H, among others. Then, the analysis and diagnosis of the initial situation of the company in the case study was developed, through the production reports and results of the analysis of a time study carried out, discovering the opportunities for improvement that can be carried out and their direct interference to the assembly time of the equipment offered. Then, the activities carried out according to the diagnosis carried out are described, highlighting the opportunities detected through the PLAN phase of the methodology. Finally, the activities associated with measuring, standardizing and documenting are carried out, this being the last phase of the methodology. An estimate of the result of the project was made, which indicates the following data: Net present value (NPV) of S/. 2,964,471 and an internal rate of return (IRR) of 285 % higher than the proposed interest rate (12%), indicating that the project is profitable.
This item is licensed under a Creative Commons License