Bibliographic citations
Otiniano, M., Vilca, F. (2016). Propuesta de un sistema de gestión de producción y seguridad y salud ocupacional basado en la Ley N° 30222 para reducir los costos de la empresa Productos Industriales del Cuero S.A.C. – Trujillo [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/11109
Otiniano, M., Vilca, F. Propuesta de un sistema de gestión de producción y seguridad y salud ocupacional basado en la Ley N° 30222 para reducir los costos de la empresa Productos Industriales del Cuero S.A.C. – Trujillo [Tesis]. PE: Universidad Privada del Norte; 2016. https://hdl.handle.net/11537/11109
@misc{renati/526325,
title = "Propuesta de un sistema de gestión de producción y seguridad y salud ocupacional basado en la Ley N° 30222 para reducir los costos de la empresa Productos Industriales del Cuero S.A.C. – Trujillo",
author = "Vilca Laos, Flor de María Cristina",
publisher = "Universidad Privada del Norte",
year = "2016"
}
ABSTRACT The current study had as objective the development of an improvement proposal for a production management system and safety and health strategy at work to reduce costs at PRODUCTOS INDUSTRIALES DEL CUERO S.A.C. - Trujillo. The investigation begins with a diagnosis of the current situation of the production site, through indicators, determining the unnecessary costs incurred by inadequate technical production planning, as well as the lack of a Safety and Health System at work. Having had identified improvement opportunities, different tools were used, methodologies pertaining to Industrial Engineering, such as Job Description, Performance Assessment, Training Plan (Production), Study of Terms, VSM, MRP, 5S Methodology; and current national regulations on Safety and Health at Work, the amending of Ley N° 29783 de Seguridad y Salud en el Trabajo, Ley N° 30222. After the application of these tools, methodologies and regulations, the proposal is evaluated by recalculating the initial designed indicators to have an objective measurement of the perceived benefit. Finally, the financial analysis which includes the costs associated with research and implementation of the proposal (S/.116 209.00), concludes that the project and its execution are profitable to generate a NPV of S/.748 549 and an annual IRR of 196%.
This item is licensed under a Creative Commons License