Look-up in Google Scholar
Full metadata record
Angeles Quiñones, Nelson
Pacheco Rodriguez, Magda Aracelli
Urtecho Tello, Arnold Alexei
2019-01-14T23:28:31Z
2019-01-14T23:28:31Z
2018-08-28
Pacheco, M. A., & Urtecho, A. A. (2018). Implantación de un sistema de información y su impacto en el proceso de producción en la empresa A&M, Trujillo 2018 [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. Recuperado de https://hdl.handle.net/11537/14628 (es_PE)
658.4038 URTE 2018 (es_PE)
https://hdl.handle.net/11537/14628
La presente tesis, muestra la implantación de un Sistema de Información. El objetivo general busca determinar el impacto en el proceso de producción de matizados de la empresa “A&M Soluciones Corporativas”, mediante el uso del SI - MatizadoSystem, con la finalidad de incrementar el nivel de eficacia, reducir el índice de incumplimiento de pedidos, rectificaciones, reclamos, nivel de merma y el tiempo de elaboración de matizados. Se analizó la situación actual de la empresa; encontràndose ubicada en el cuadrante V de la matriz IE. Se analizó la situación actual del proceso de producción para identificar la realidad problemática; se realizó la identificación de las actividades y los puntos críticos del proceso; procediendo a su diagramación mediante BPM y Bizagi. La implantación del SI, permitió resultados favorables en ambas dimensiones (producción y calidad del producto). El Van del proyecto es de S/. 45534, a un descuento de 10%. La TIR es de 42%, mostrando la rentabilidad del proyecto. La solución SI/TI, optimizó el proceso de producción; y contribuye, con el crecimiento empresarial y del país. (es_PE)
This thesis shows the implementation of an Information System. The general objective is to determine the impact on the production process of nuances of the company “A & M Corporate Solutions“, by using the SI - MatizadoSystem, in order to increase the level of efficiency, reduce the rate of non - fulfillment of orders, rectifications , claims, level of shrinkage and the time of elaboration of nuances. The current situation of the company was analyzed; being located in quadrant V of the IE matrix. The current situation of the production process was analyzed to identify the problematic reality; the identification of the activities and the critical points of the process was made; proceeding to its layout through BPM and Bizagi. The implementation of the SI, allowed favorable results in both dimensions (production and product quality). The Van of the project is S /. 45534, at a discount of 10%. The IRR is 42%, showing the profitability of the project. The SI / IT solution optimized the production process; and contributes, with business and country growth. (es_PE)
Tesis (es_PE)
application/pdf (es_PE)
application/msword
spa (es_PE)
Universidad Privada del Norte (es_PE)
info:eu-repo/semantics/openAccess (es_PE)
https://creativecommons.org/licenses/by-nc-sa/3.0/us/
Universidad Privada del Norte (es_PE)
Repositorio Institucional - UPN (es_PE)
Administración de la información (es_PE)
Sistemas de información (es_PE)
Producción (es_PE)
Implantación de un sistema de información y su impacto en el proceso de producción en la empresa A&M, Trujillo 2018 (es_PE)
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Privada del Norte. Facultad de Ingeniería (es_PE)
Ingeniería Empresarial (es_PE)
Título Profesional (es_PE)
Ingeniero Empresarial (es_PE)
PE (es_PE)
https://purl.org/pe-repo/ocde/ford#2.11.00 (es_PE)
Pregrado (es_PE)
https://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
18140225
https://orcid.org/0000-0002-7135-8902 (es_PE)
46128306
70666829
413576 (es_PE)
http://purl.org/pe-repo/renati/type#tesis (es_PE)
Privada societaria



This item is licensed under a Creative Commons License Creative Commons