Bibliographic citations
Ruiz, C., (2019). Plan de mantenimiento preventivo para reducción de costos operativos de la EPS-RS Ecoambiensac IB S. A. C. – Cajamarca 2017 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/22231
Ruiz, C., Plan de mantenimiento preventivo para reducción de costos operativos de la EPS-RS Ecoambiensac IB S. A. C. – Cajamarca 2017 [Tesis]. PE: Universidad Privada del Norte; 2019. https://hdl.handle.net/11537/22231
@misc{renati/521099,
title = "Plan de mantenimiento preventivo para reducción de costos operativos de la EPS-RS Ecoambiensac IB S. A. C. – Cajamarca 2017",
author = "Ruiz Torres, Charles Luis",
publisher = "Universidad Privada del Norte",
year = "2019"
}
The purpose of this work was to reduce the operating costs of the EPS-RS ECOAMBIENSAC IB company. S.A.C. For this, a Preventive Maintenance Plan was implemented, which would help reduce operating costs since there were too many losses due to unexpected stops of the machinery, to have a greater degree of reliability in the production process of the company's vehicles. First, a diagnosis was made of the current situation of the company ECOAMBIENSAC IB. S.A.C. After carrying out the diagnosis of the company, 4 root causes of the production cost overruns of the company ECOAMBIENSAC IB SAC were obtained, and of them we have that in the cash flow table 2016, in the operating expenses in which the unexpected stops intervened They correspond to 26% of the total losses and 44% of the annual operating cost, which is why it is necessary to implement a Preventive Maintenance Plan since the largest amount of economic losses for the company are due to this problem. This application work details the implementation of the improvement proposal, the Preventive Maintenance Plan, which was evaluated based on the reliability of the vehicles and at the economic level. Which determined that: the level of reliability of the vehicles initially obtained is 34% and after the implementation of the improvement proposal a degree of reliability of 12% was obtained having considerably improved the reliability of the vehicles, in economic terms the cost overruns that are generating the 4 prioritized causes that add up to S /. 443 260.00 and the improved cost overruns amount to S /. 254 863.00 annually, having achieved an improvement in S /. 188 398.00 with the implementation of the Preventive Maintenance Plan. The preventive maintenance plan managed to reduce the operational costs of the EPS-RS ECOAMBIENSAC IB. S.A.C. in 21%.
This item is licensed under a Creative Commons License