Bibliographic citations
This is an automatically generated citacion. Modify it if you see fit
Cornejo, N., (2019). Impacto del sistema de monitoreo en la productividad de la empresa carbón y miel de Trujillo, 2018 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/21874
Cornejo, N., Impacto del sistema de monitoreo en la productividad de la empresa carbón y miel de Trujillo, 2018 [Tesis]. PE: Universidad Privada del Norte; 2019. https://hdl.handle.net/11537/21874
@misc{renati/520747,
title = "Impacto del sistema de monitoreo en la productividad de la empresa carbón y miel de Trujillo, 2018",
author = "Cornejo Donayre, Naymlap Antarki",
publisher = "Universidad Privada del Norte",
year = "2019"
}
Title: Impacto del sistema de monitoreo en la productividad de la empresa carbón y miel de Trujillo, 2018
Authors(s): Cornejo Donayre, Naymlap Antarki
Advisor(s): Vela Gonzales, Edwards Williams
Keywords: Productividad; Control de calidad; Administración de procesos; Sistema de monitoreo; Impacto de la productividad
OCDE field: https://purl.org/pe-repo/ocde/ford#5.02.04
Issue Date: 20-Jun-2019
Institution: Universidad Privada del Norte
Abstract: La presente investigación de diseño pre - experimental bajo un diseño pre – test y post-test con un solo grupo, el cual tiene como objetivo determinar el impacto del sistema de monitoreo en la productividad de la empresa Carbón y Miel de Trujillo, 2018, para lo cual se contó con la participación de una muestra conformada por 44 colaboradores de la empresa; a quienes se evaluó con el Cuestionario de Productividad, fue validado previamente con expertos en el tema, además su coeficiente de confiabilidad fue de 0.88. Los resultados demostraron que existe un incremento en las dimensiones de verificación de la disposición, en donde antes de la implementación del sistema sólo el 20.45% mantenía un nivel alto frente al 68.18% que mantenía dicho nivel posteriormente; además existió un incremento en la dimensión verificación de equipos, dado que antes de la implementación un 59.0% mantenía un nivel alto, mientras que una vez implementado el sistema el 75% de los trabajadores mantuvo un nivel alto, y existe una mejora en la dimensión verificación de procedimientos, dado que antes de la implementación el 27.27% mantenía un nivel alto, mientras que después de la implementación un 77.27% obtuvo un nivel alto. Se llegó a la conclusión que la implementación del sistema de monitoreo incrementó la productividad en la empresa Carbón y Miel S.R.L, dado que durante el año 2018 se apreció un progreso de la productividad del 186% en comparación con el año anterior, así como se estima que el índice de productividad se mantendrá en ascenso durante los siguientes años.
The present research with pre - experimental design under a pre - test and post - test focus with a single group, which aims to determine the impact of the monitoring system on the productivity of the company Carbón y Miel at Trujillo city, 2018, for which was attended by a sample consisting of 44 employees of the company; whose were evaluated with the Productivity Questionnaire, was previously validated with experts in the subject, also its reliability coefficient was 0.88. The results showed that there is an increase in the dimension verification of the provision, where before the implementation of the system only 20.45% maintained a high level compared to 68.18% that maintained that level later; there was also an increase in the dimension verification of equipment, given that before the implementation a 59.0% maintained a high level, while once implemented the system 75% of workers maintained a high level, and there is an improvement in the dimension verification of procedures, given that before implementation 27.27% maintained a high level, while after implementation 77.27% obtained a high level. It was concluded that the implementation of the monitoring system increased productivity in the company Carbón y Miel S.R.L., given that during the year 2018 a productivity progress of 186% was achieved compared to the previous year and it is estimated that the productivity index will continue to rise during the following years.
The present research with pre - experimental design under a pre - test and post - test focus with a single group, which aims to determine the impact of the monitoring system on the productivity of the company Carbón y Miel at Trujillo city, 2018, for which was attended by a sample consisting of 44 employees of the company; whose were evaluated with the Productivity Questionnaire, was previously validated with experts in the subject, also its reliability coefficient was 0.88. The results showed that there is an increase in the dimension verification of the provision, where before the implementation of the system only 20.45% maintained a high level compared to 68.18% that maintained that level later; there was also an increase in the dimension verification of equipment, given that before the implementation a 59.0% maintained a high level, while once implemented the system 75% of workers maintained a high level, and there is an improvement in the dimension verification of procedures, given that before implementation 27.27% maintained a high level, while after implementation 77.27% obtained a high level. It was concluded that the implementation of the monitoring system increased productivity in the company Carbón y Miel S.R.L., given that during the year 2018 a productivity progress of 186% was achieved compared to the previous year and it is estimated that the productivity index will continue to rise during the following years.
Link to repository: https://hdl.handle.net/11537/21874
Discipline: Administración
Grade or title grantor: Universidad Privada del Norte. Facultad de Negocios
Grade or title: Licenciado en Administración
Juror: Infante Linares, Jocelyn; Sánchez Quiroz, Julio; Zurita Guerrro, Graciela
Register date: 13-Jul-2019
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.