Bibliographic citations
Alcántara, R., (2015). Propuesta de mejora del área de producción de la planta de alimento balanceado para incrementar la rentabilidad de la empresa Avícola Yois S.R.L. [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/10245
Alcántara, R., Propuesta de mejora del área de producción de la planta de alimento balanceado para incrementar la rentabilidad de la empresa Avícola Yois S.R.L. [Tesis]. PE: Universidad Privada del Norte; 2015. https://hdl.handle.net/11537/10245
@misc{renati/518587,
title = "Propuesta de mejora del área de producción de la planta de alimento balanceado para incrementar la rentabilidad de la empresa Avícola Yois S.R.L.",
author = "Alcántara Gonzales, Rogger Frank",
publisher = "Universidad Privada del Norte",
year = "2015"
}
This research study was conducted in the area of production Plant Diet Foods Company SRL Poultry yois and aimed to improve the profitability of the company, using techniques and methods of industrial engineering. The research problem arises when the following problems were identified: unmet demand, unknowns management tools, lack of order in the area, poor production planning, stops for corrective failures, everything was based according to empirical criteria. A diagnosis of the current production management in the enterprise was performed, then a collection of sales are made in the last two years and model demand forecasting based on historical data and a master production schedule was proposed to determine the amounts necessary to produce daily, weekly and monthly, which lead us to produce more amounts up to actually sued. It has managed to increase sales revenue by 5% which means compared to the current system an additional annual income of S / 817,668.00. The other was raised implement lean manufacturing tools to reduce the cost for delays in shipments of raw material to the mixing area, decreasing by 92% the actual cost, generating for the company annual savings of S /. 4095.92. 50% Through a Preventive Maintenance Plan will decrease the number of stops per year machinery and machine availability is increased to 93%, generating savings of S /. 187.776. Besides reducing downtime in corrective maintenance and increase OEE company therefore increase profitability by having more final product for sale. Finally an economic evaluation was performed considering all the savings that could be generated by the proposal and the potential costs of implementation which should incur. Cash flow performed showed a VAN of S / 510,429.00, an TIR = 63.9%, B / C = 1.80. Whereas the project is fully implemented in a year, which is quite favorable, since what is sought is to reduce logistics costs without increasing total costs. In general it can be concluded that this project is entirely feasible from the point of view, economic and also because all the costs of the improvement, implementation and operation so that there are incentives were considered so that they run the proposed changes, decreasing thus the resistance to change and ensuring greater success in implementation.
This item is licensed under a Creative Commons License