Buscar en Google Scholar
Registro completo de metadatos
Vereau Miranda, Edmundo
Gerundas Asto, Jose Enrique
Paucar Romero, Bryan Jesus
2023-12-12T21:19:07Z
2023-12-12T21:19:07Z
2023-08-01
Gerundas, J. E., & Paucar, B. J. (2023). Análisis comparativo de tiempo, precisión y costo entre un levantamiento topográfico con RPA y estación total en el complejo deportivo Venezuela de Ayacucho, provincia Huamanga [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/35354 (es_PE)
624.0287 GERU 2023 (es_PE)
https://hdl.handle.net/11537/35354
En la actualidad la topografía ha tenido evoluciones significativas, con técnicas e instrumentos que permiten realizar mediciones directas o indirectas de la superficie terrestre, de una manera más rápida y obteniendo resultados cada vez más precisos y confiables. El objetivo de la investigación fue evaluar la diferencia de tiempo, precisión y costo de dos métodos directos de levantamientos topográficos con el método RPA y la estación total. El trabajo de campo se realizó mediante la recolección de datos, los cuales fueron procesados con el software pix4d mapper, donde se obtuvo la nube de puntos, ortofoto, modelo digital de elevación y superficie con curvas de nivel. Posterior a ello, se procesó la información obtenida anteriormente con el uso del software AutoCAD Civil 3d para la obtención de los puntos y su comparación. El trabajo de investigación fue de tipo aplicada por el hecho que se centra a encontrar mecanismos para la obtención de datos cuantitativos y poder comprarlos. La muestra es en el complejo deportivo Venezuela de Ayacucho de 7.5 Has. Como resultados, se evidenció que el levantamiento topográfico con RPA tuvo una tolerancia menor a -0.066 m respecto a la estación total. Además, presentó una mejor factibilidad económica en un 11.98% respecto a la estación total, con respecto al tiempo, se determinó una disminución en el cronograma de ejecución de hasta un 60% respecto al levantamiento con estación total. Se concluye que el método de levantamiento topográfico con RPA tiene una precisión aceptable para este tipo de levantamientos, el costo obtenido resultó ser menor y el tiempo fue menor respecto al levantamiento topográfico con estación total. (es_PE)
Currently, topography has undergone significant developments, with techniques and instruments that allow direct or indirect measurements of the earth's surface to be made more quickly and obtaining increasingly accurate and reliable results. The objective of the research was to evaluate the difference in time, precision and cost of two direct methods of topographic surveys with the RPA method and the total station. The field work was carried out by collecting data, which were processed with the pix4d mapper software, where the point cloud, orthophoto, digital elevation model and surface with contour lines were obtained. After that, the information previously obtained with the use of AutoCAD Civil 3d software was processed to obtain the points and their comparison. The research work was of an applied type due to the fact that it focuses on finding mechanisms to obtain quantitative data and to be able to buy them. The sample is in the Venezuela de Ayacucho sports complex of 7.5 Has. As results, it was evidenced that the topographic survey with RPA had a tolerance of less than -0.066 m with respect to the total station. In addition, it presented a better economic feasibility by 11.98% compared to the total station, with respect to time, a decrease in the execution schedule of up to 60% was determined compared to the total station survey. It is concluded that the topographic survey method with RPA has an acceptable precision for this type of survey, the cost obtained was lower and the time was shorter compared to the topographic survey with total station. (es_PE)
Tesis (es_PE)
application/pdf (es_PE)
application/msword (es_PE)
spa (es_PE)
Universidad Privada del Norte (es_PE)
info:eu-repo/semantics/openAccess (es_PE)
https://creativecommons.org/licenses/by-nc-sa/3.0/us/ (*)
Universidad Privada del Norte (es_PE)
Repositorio Institucional - UPN (es_PE)
Topografía (es_PE)
Topografía minera (es_PE)
Tiempo (es_PE)
Precisión (es_PE)
Costo (es_PE)
Estación total (es_PE)
RPA (es_PE)
Time (es_PE)
Precision (es_PE)
Cost (es_PE)
Total station (es_PE)
Análisis comparativo de tiempo, precisión y costo entre un levantamiento topográfico con RPA y estación total en el complejo deportivo Venezuela de Ayacucho, provincia Huamanga (es_PE)
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Privada del Norte. Facultad de Ingeniería (es_PE)
Ingeniería Civil (es_PE)
Título Profesional (es_PE)
Ingeniero Civil (es_PE)
PE (es_PE)
https://purl.org/pe-repo/ocde/ford#2.01.01 (es_PE)
Pregrado (es_PE)
http://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
10557797
https://orcid.org/0000-0003-1984-1734 (es_PE)
73528844
76373053
732016 (es_PE)
Neyra Torres, Jose Luis
Rabanal Chavez, Erick Humberto
Campos Vasquez, Neicer
http://purl.org/pe-repo/renati/type#tesis (es_PE)
Privada societaria



Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons