Diaz, J., Venero, R. (2022). Propuesta de gestión de cambios y su influencia en el cronograma y costos utilizando la metodología EVM en estructuras de concreto armado del proyecto multifamiliar Las Flores, SJL, Lima 2021 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/30700
Diaz, J., Venero, R. Propuesta de gestión de cambios y su influencia en el cronograma y costos utilizando la metodología EVM en estructuras de concreto armado del proyecto multifamiliar Las Flores, SJL, Lima 2021 [Tesis]. PE: Universidad Privada del Norte; 2022. https://hdl.handle.net/11537/30700
@misc{renati/515775,
title = "Propuesta de gestión de cambios y su influencia en el cronograma y costos utilizando la metodología EVM en estructuras de concreto armado del proyecto multifamiliar Las Flores, SJL, Lima 2021",
author = "Venero Beingolea, Ronald",
publisher = "Universidad Privada del Norte",
year = "2022"
}
This research seeks to develop a change management proposal and analyze its influence on costs and schedule using the EVM methodology in reinforced concrete structures of the Las Flores multifamily building, SJL, Lima 2021, the research methodology is of an applied type, explanatory causal method, the design is Non-Experimental - transversal and the approach is quantitative, which seeks to describe the advantages provided by the proposal of a change management procedure through the EVM methodology in the constructive development of the reinforced concrete items. The following results were obtained from the case studied; the implementation of a change procedure and its validity using Cronbach's alpha formula obtaining a result of 0.9823 which means that it is excellently reliable and applicable to the development of the case study. The performance of the work was also analyzed through the EVM, to know the status of the construction development based on the calculation of the variations, cost and schedule performance indices and the forecasts of the cost at the closing of the reinforced concrete items. It is concluded that the use of a change management procedure and using EVM allows obtaining data for corrective decision making in order to comply with the planned baselines of a project.