Cóndor, J., (2014). Propuesta de implementación del balance de líneas para incrementar la productividad en el área de chancado de caliza de la empresa cementos Pacasmayo S.A.A – Pacasmayo [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/6506
Cóndor, J., Propuesta de implementación del balance de líneas para incrementar la productividad en el área de chancado de caliza de la empresa cementos Pacasmayo S.A.A – Pacasmayo [Tesis]. PE: Universidad Privada del Norte; 2014. https://hdl.handle.net/11537/6506
@misc{renati/514690,
title = "Propuesta de implementación del balance de líneas para incrementar la productividad en el área de chancado de caliza de la empresa cementos Pacasmayo S.A.A – Pacasmayo",
author = "Cóndor Bautista, James Jhon",
publisher = "Universidad Privada del Norte",
year = "2014"
}
ABSTRACT The present work had as objective the development of a Line Balance System to increase productivity in the area of limestone crushing Cementos Pacasmayo . First problem was identified within the company, allowing the main problems found there. Actual times were taken for each of the activities of the operation, subsequently conducted the study of time and so we found the standard times , which helped us identify the bottleneck that this case became the team the primary sieve . Subsequently performed online balance, which resulted in us only use 54.1% of the production process for the implementation of the improvement can be increased according to the calculations up to 97 %. Besides the operation could desist “pick of fine material” as a result of implementation. At present, the production cost is S /. 27.40 With implementing this cost is reduced to S / 23.67; resulting generating savings for the company. Finally, we will present the findings of the proposal to implement the selected line balance and recommendations for the maintenance and proper implementation of the tools mentioned in previous lines within the company under study. The results that were obtained are: standardization of times on production lines was determined that the standard time is now 374 seconds and the proposal is reduced to 282 seconds. According to the indicators NPV, IRR & COK, implementation is feasible, considering the VAN S / 89 599.2; IR 33.58 % higher than the opportunity cost of 25% and the cost benefit is 1.5.