Bibliographic citations
Reyes, N., Valdiviezo, K. (2022). Propuesta de mejora en la gestión de producción y logística para incrementar la rentabilidad de una fábrica de calzado, Trujillo 2020 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/31362
Reyes, N., Valdiviezo, K. Propuesta de mejora en la gestión de producción y logística para incrementar la rentabilidad de una fábrica de calzado, Trujillo 2020 [Tesis]. PE: Universidad Privada del Norte; 2022. https://hdl.handle.net/11537/31362
@misc{renati/514254,
title = "Propuesta de mejora en la gestión de producción y logística para incrementar la rentabilidad de una fábrica de calzado, Trujillo 2020",
author = "Valdiviezo Meregildo, Karina Isabel",
publisher = "Universidad Privada del Norte",
year = "2022"
}
The general objective of this research work was to determine the impact of the proposal for improvement in production and logistics management on the profitability of a footwear factory. At the beginning of the study, the current situation of the company was analyzed first, finding serious problems with poor empirical cutting, tannery selection, production planning, line balance and layout, before improvement due to the low profitability of the company. organization. For this, tools such as field observation, interview, document analysis and survey were used, to analyze the costs after the improvement proposal. The results obtained were analyzed by processing data in spreadsheets, using management tools. Where the result was the increase in the profitability of the organization by 26.9%. Likewise, with the implementation of the balance of lines using the method of the production index, positional weight, and workstations, which allowed savings of S/21,520. In addition, leather waste was reduced from 20% to 17.2%, using the footage technique, the optimization in the allocation of leather purchases to tanneries allowed savings of S/1,769 and with the proposed new layout, a benefit of S / 679. With better forecast, lost sell are eliminated. This work has a net present value of NPV of S/ 5,133, an IRR of 60.64%, B/C of 1.64 and it was determined that the investment will be recovered in 5 months. Therefore, it is concluded that this proposal is feasible and profitable for the shoe factory.
This item is licensed under a Creative Commons License