Bibliographic citations
Arredondo, A., (2021). Problemática del proceso de contratación en la adquisición de bienes, fiscalizado por el Organismo Supervisor de las Contrataciones del Estado; Lima, 2019 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/28891
Arredondo, A., Problemática del proceso de contratación en la adquisición de bienes, fiscalizado por el Organismo Supervisor de las Contrataciones del Estado; Lima, 2019 [Tesis]. PE: Universidad Privada del Norte; 2021. https://hdl.handle.net/11537/28891
@misc{renati/514081,
title = "Problemática del proceso de contratación en la adquisición de bienes, fiscalizado por el Organismo Supervisor de las Contrataciones del Estado; Lima, 2019",
author = "Arredondo Chaupis, Aracelly Stefany",
publisher = "Universidad Privada del Norte",
year = "2021"
}
The objective of the research was to identify what is the problem of the contracting process in the acquisition of goods, supervised by the state contracting supervisory body, Lima 2019. Regarding the methodology, the type of research according to its level is explanatory since presents the reality of the problem, descriptive because it analyzes the relationship of the problem because it verifies the relationship between the variables; with a qualitative approach because data collection was carried out without manipulating the information, with a grounded theory design. The sample obtained was extracted from the osce portal, the documentary technique and the interview were used, with the documentary analysis instruments, interview guide. The result was extracted from the resolutions of the state procurement court, interviewing two specialists. It was concluded that a solid level of commitment and suitability has not yet been reached in the personnel that intervenes in state contracting, both by the selection committee and the bidders, problems exist every time they are not qualified in an appropriate way in benefit of the entity and of the people who will make use of the acquired asset, in addition there is still an index of bad practices of the bidder, said action causes the sum of resolutions that the contracting court must evaluate, so the effectiveness of the contracting process it is conditional on the good work that everyone involved can do.
This item is licensed under a Creative Commons License