Bibliographic citations
Caballero, S., (2018). Implementación de Last Planner System para mejorar el cumplimiento de plazos de ejecución en una obra pública de saneamiento por administración directa en el distrito de Santa Rosa de Quives, Canta - Lima en el periodo 2016 - 2017 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/12925
Caballero, S., Implementación de Last Planner System para mejorar el cumplimiento de plazos de ejecución en una obra pública de saneamiento por administración directa en el distrito de Santa Rosa de Quives, Canta - Lima en el periodo 2016 - 2017 [Tesis]. PE: Universidad Privada del Norte; 2018. https://hdl.handle.net/11537/12925
@misc{renati/513769,
title = "Implementación de Last Planner System para mejorar el cumplimiento de plazos de ejecución en una obra pública de saneamiento por administración directa en el distrito de Santa Rosa de Quives, Canta - Lima en el periodo 2016 - 2017",
author = "Caballero Claudio, Santos Pablo",
publisher = "Universidad Privada del Norte",
year = "2018"
}
ABSTRACT The present investigation has like general objective To implement the methodology of the Last Planner System (Last Planner System) to improve the fulfillment of terms of execution in a public work of sanitation under the modality of direct budgetary execution in the district of Santa Rosa de Quives, province of Canta and department of Lima in the period 2016 - 2017. Public entities perform works by contract and by direct administration; in the first case they are the contractors that adopt the most convenient tools and methodologies to optimize their profitability and, even so, these have certain losses. In the second case, public entities execute the works in a traditional manner without considering relevant aspects in the planning, programming and control stage, which leads to significant variability that affects the management of the execution of the work with cost overruns, defaults and bad image. With the approaches of the lean construction philosophy, which professes a construction without losses, the pilot of the application of LPS was executed, in a span of 9 weeks, equivalent to 60 days, which was the execution period, whose implementation was led by the technical area of the municipality: the Sub Management of Urban and Rural Development and the other support areas: Logistics and Budget Unit. Based on the work execution schedule of the technical file, the master plan was drawn up, where the relevant milestones in the planning and programming of the work were identified, then the intermediate plan was prepared (look ahead: look forward), where the restrictions of the first 4 weeks and those responsible for the lifting of these restrictions were determined, later the weekly plan was elaborated where only the activities are scheduled without restrictions and at the end of each week the reliability of the programming was evaluated with the calculations of the Percentage of Completed Activities and causes of non-compliance to adopt corrective measures and make continuous improvement in the following weeks. It was also monitored, and progress control was made with the S curve, to give more support to the programming. According to the results, it is concluded that it is a good practice; Favorable results were obtained as it was completed in the committed period despite seasonal weather adversities. In addition, as a consequence of the adequate management of production, savings could be achieved in favor of the project. KEYWORDS: Master Plan, Weekly Plan, look ahead (forward), restrictions, Percentage of activities completed, causes of non-compliance, progress and term control.