Bibliographic citations
Fabián, R., (2012). Diseño de un plan de mantenimiento preventivo para reducir los costos en el área de mantenimiento de la Empresa de Transportes Fabián Express S.A.C. [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/10347
Fabián, R., Diseño de un plan de mantenimiento preventivo para reducir los costos en el área de mantenimiento de la Empresa de Transportes Fabián Express S.A.C. [Tesis]. PE: Universidad Privada del Norte; 2012. https://hdl.handle.net/11537/10347
@misc{renati/512360,
title = "Diseño de un plan de mantenimiento preventivo para reducir los costos en el área de mantenimiento de la Empresa de Transportes Fabián Express S.A.C.",
author = "Fabián Rodríguez, Rogger Pedro",
publisher = "Universidad Privada del Norte",
year = "2012"
}
ABSTRACT Fabian Express S.A.C. is a family business founded in 2012 is a merger of Transport Fabian (1997)and Transport Fabian R (2008) and are designed to serve heavy freight in the city of Trujillo has done business for over 14 years creating a connection trade between the major companies in the northern region As every organization has goals and one of them raise their competitiveness by improving the quality of service and compete successfully on the market the lack of an efficient maintenance plan results in unscheduled downtime of the current which slows service delivery leading to accumulation of loss of time etc. tasks. The aim of this study is to design a maintenance plan which involves an assessment of the actual state of maintenance data collection for maintenance (through interviews) followed by the collection of technical information in order to learn in depth each through visits to machinery maintenance workshops and information resources of the company to maintain and create an inventory of equipment and resources available to the company developed a plan of activities through the monthly preventive maintenance program. The type of research conducted for this study were characterized by Field and Documentary Descriptive because data collection was performed directly in the company without manipulating any information and more information on the equipment was taken from technical manuals for each machine The application of the maintenance plan allows execution of work more efficient and reliable total project investment is S /. 20,000.00 Dollars and the results of the economic indicators are positive because the VAN amounts to S /. 53,342.00 Dollars and an TIR of 45% the economic recovery period of 01 years 10 months 18 days
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.