Angeles, W., Torre, R. (2023). Propuesta de mejora para aumentar la productividad en la construcción de redes de gas natural aplicando las herramientas de Lean manufacturing y Lean construction. [Trabajo de Suficiencia Profesional, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/671925
Angeles, W., Torre, R. Propuesta de mejora para aumentar la productividad en la construcción de redes de gas natural aplicando las herramientas de Lean manufacturing y Lean construction. [Trabajo de Suficiencia Profesional]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2023. http://hdl.handle.net/10757/671925
@misc{renati/413454,
title = "Propuesta de mejora para aumentar la productividad en la construcción de redes de gas natural aplicando las herramientas de Lean manufacturing y Lean construction.",
author = "Torre Quispe, Robert William",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2023"
}
In this work of Professional Competence, the tools of Lean Manufacturing and Lean Construction are used to improve the low productivity of one of the contracting companies (Contractor A) of the Concessionaire of the gas network distribution system of Lima and Callao. The focus of this work was the construction of natural gas networks, and the causes of the problem were identified, giving place to two objectives: to reduce reprocessing work and to improve the quality of the product. With the achievement of these objectives, productivity will increase, and the extra costs generated by each cause will be reduced. The first chapter introduces the current state of the organization at the international and national levels. Likewise, it presents the theoretical framework in which the methodology to be implemented by Lean Manufacturing and Lean Construction is described. The second chapter describes the participation of the Concessionaire and its responsibility with Peru. Furthermore, the problem is identified and the analysis of the causes of the problem is carried out, thus outlining the general and specific objectives. In the third chapter, the link between the cause and the solution is laid out, showing the step-by-step process. The indicators and indicator reports are also produced, which allow us to measure the process. On the other hand, the budget of the solution and its timeline are formulated. In chapter four, the validation of the proposal is carried out by developing the implementation phases, and the economic and non-economic impacts are evaluated. Last, the conclusions and recommendations are presented.