Title: Evaluación de los sistemas de losas con viguetas pretensadas y prelosas con respecto al costo y tiempo en la construcción del edificio multifamiliar Aliaga Garden en el distrito de Magdalena del Mar, Lima
Other Titles: Evaluation of slab systems with prestressed joists and preslabs respect to cost and time in the Construction of Aliaga Garden multifamiliar building in Magdalena del Mar, Lima
Advisor(s): Lopez Pasapera, Karla Lisette
OCDE field: https://purl.org/pe-repo/ocde/ford#2.01.01; https://purl.org/pe-repo/ocde/ford#2.00.00
Issue Date: 11-Dec-2023
Institution: Universidad Peruana de Ciencias Aplicadas (UPC)
Abstract: La presente investigación se desarrolla debido a que en la actualidad para realizar la construcción de una losa de techo se necesitan seguir demasiados procesos, esto se puede notar en las partidas de encofrado y vaciado de concreto. Debido a ello se evaluó los sistemas constructivos que usan las viguetas pretensadas y el que usa las prelosas, todo esto basado en un caso real, el edificio multifamiliar Aliaga Garden. El principal objetivo de esta tesis es el de evaluar el uso de prelosas y viguetas pretensadas con respecto al costo y tiempo para el caso mencionado. En base a este estudio, se obtiene como primer resultado que el uso de viguetas pretensadas en el piso 2 tiene un costo directo de 75,296.03 soles y 55,334.81 soles con el uso de prelosas para el piso 3. Como segundo resultado, se obtiene que la construcción del piso 2 con el uso de viguetas pretensadas tiene un tiempo de ejecución de 5.5 días, mientras que utilizando las prelosas en el piso 3, se tienen solo 3 días. La investigación concluye que la técnica que utiliza prelosas tiene un procedimiento más rápido y con menos recursos para su ejecución con respecto al uso de viguetas pretensadas, además, el costo utilizando prelosas representa un ahorro del 26.51% en costo y 45.45% en cuanto a tiempo.

The present investigation is developed because currently to carry out the construction of a ceiling slab, too many processes need to be followed, this can be noticed in the formwork and concrete pouring items. Due to this, the construction systems that use prestressed joists and the one that uses pre-slabs were evaluated, all based on a real case, the Aliaga Garden multifamily building. The main objective of this thesis is to evaluate the use of prestressed preslabs and joists with respect to cost and time for the aforementioned case. Based on this study, the first result is obtained that the use of prestressed joists on floor 2 has a direct cost of 75,296.03 soles and 55,334.81 soles with the use of prestressed slabs for floor 3. As a second result, it is obtained that the construction of floor 2 with the use of prestressed joists has an execution time of 5.5 days, while using the pre-slabs on floor 3, there is only 3 days. The research concludes that the technique that uses pre-slabs has a faster procedure and with fewer resources for its execution with respect to the use of prestressed joists, in addition, the cost using pre-slabs represents a saving of 26.51% in cost and 45.45% in terms of time.
Discipline: Ingeniería Civil
Grade or title grantor: Universidad Peruana de Ciencias Aplicadas (UPC). Facultad de Ingeniería
Grade or title: Ingeniero Civil
Juror: Eyzaguirre Acosta, Carlos Augusto; Vise Gómez, Juan Carlos
Register date: 19-Jan-2024



This item is licensed under a Creative Commons License Creative Commons