Bibliographic citations
Flores, M., Torres, E. (2023). Aplicación de las herramientas SLP y TPM para reducir el incumplimiento del tiempo de entrega de los pedidos en una empresa de fabricación de ferretería eléctrica [Trabajo de Suficiencia Profesional, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/671565
Flores, M., Torres, E. Aplicación de las herramientas SLP y TPM para reducir el incumplimiento del tiempo de entrega de los pedidos en una empresa de fabricación de ferretería eléctrica [Trabajo de Suficiencia Profesional]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2023. http://hdl.handle.net/10757/671565
@misc{renati/412692,
title = "Aplicación de las herramientas SLP y TPM para reducir el incumplimiento del tiempo de entrega de los pedidos en una empresa de fabricación de ferretería eléctrica",
author = "Torres Shuan, Edwin Antonio",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2023"
}
This project presents the main problems that a company in the metal-mechanical sector has (dedicated to the manufacture of electrical hardware), in turn the improvements that were made using two pillars of the TPM, focused improvements and quality maintenance, were also used. the SLP Tool to reduce process journeys. In the first chapter, we will make a brief description of the main industrial engineering tools that allow us to reduce incomplete and untimely orders. In the second chapter the company is described and the current state will be analyzed showing the causes of the main problem. Also, an analysis will be carried out on the root causes that are generating incomplete and out-of-date deliveries. The current diagnosis of the company was carried out using statistical methods, in which the root cause of the problem was determined, low rate of complete and on-time deliveries, then we will delimit the study to the products which have generated the greatest non-compliance with orders. The processes involved in the manufacturing of these products were analyzed in order to find the reason why delays occur. The third chapter develops the implementation of the tools in the company, as well as the design of the indicators, resource management and the schedule of activities used in the development of the project. Finally, in the fourth chapter, the functional and economic validation of the implementation of the improvements was carried out.
This item is licensed under a Creative Commons License