Citas bibligráficas
Rodriguez, M., Rivera, C. (2023). Aplicación de la Metodología Six Sigma y la Ingeniería de métodos para reducir el índice de productos defectuosos en la línea denim en una lavandería industrial de Lima - Perú [Trabajo de Suficiencia Profesional, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/671346
Rodriguez, M., Rivera, C. Aplicación de la Metodología Six Sigma y la Ingeniería de métodos para reducir el índice de productos defectuosos en la línea denim en una lavandería industrial de Lima - Perú [Trabajo de Suficiencia Profesional]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2023. http://hdl.handle.net/10757/671346
@misc{renati/412041,
title = "Aplicación de la Metodología Six Sigma y la Ingeniería de métodos para reducir el índice de productos defectuosos en la línea denim en una lavandería industrial de Lima - Perú",
author = "Rivera Lazo, Christian Jayr",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2023"
}
This research project consists of the development of an improvement proposal to reduce the rate of defective products in the denim line in an industrial laundry in Lima - Peru, applying the Six Sigma methodology and Methods Engineering. The completion of this work began with the search for information on the current situation of the sector under study, the textile sector. Once the background of the research project was concluded, the diagnosis of the current problem of the company under study was carried out. First, the current problem was identified through manual records, to transfer information to a database and identify its main indicator and its economic impact. Next, the root causes were analyzed, and the project objectives were outlined. The design and development of the proposal was developed by linking each of the root causes with a solution found in the literature review. Next, the design of the new proposed model and its description were developed. One of the last phases of the research project was the validation of the project, which consisted of applying the proposed model through a pilot plan. Where, after its application, the results obtained were measured and compared with those determined in the initial situation. Likewise, an evaluation of the impacts of the project was carried out. The economic evaluation consisted of formulating all the considerations for the implementation of the project in a real context, considering all the benefits, costs, expenses, investments, among other fundamental concepts that would allow the management of the company under study to observe the economic results. Finally, the non-economic impacts that will be observed during the development of the entire project and its implementation will be evaluated.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons