Look-up in Google Scholar
Title: Implementación de una guía para la etapa de operación para un tanque de tormentas usando la metodología BIM para evitar inundaciones en el hospital de Chulucanas, Piura
Other Titles: Implementation of a guide for the operation stage of a stormwater tank using BIM Methodology to prevent flooding at Chulucanas Hospital, Piura
Advisor(s): Rosas Barturen, Miluska Anthuannet
OCDE field: https://purl.org/pe-repo/ocde/ford#2.01.01; https://purl.org/pe-repo/ocde/ford#2.00.00
Issue Date: 13-Nov-2023
Institution: Universidad Peruana de Ciencias Aplicadas (UPC)
Abstract: El presente estudio se enfoca en la implementación de una guía para la etapa de operación de un tanque de tormentas en el Hospital de Chulucanas, Piura, utilizando la metodología Building Information Modeling (BIM) con el propósito de evitar inundaciones y garantizar la operación ininterrumpida de la institución médica. Los resultados demuestran que la aplicación de esta guía ha conducido a una operación continua del tanque de tormentas en un 99.5% del tiempo, una reducción del 40% en inundaciones anuales y una disminución del 50% en daños materiales relacionados con inundaciones. Además, se ha mejorado significativamente la satisfacción del personal y usuarios del hospital, con índices de satisfacción del 90% y 80%, respectivamente. El tiempo de respuesta a emergencias se ha reducido en un 25%, y la capacidad de evacuación del tanque de tormentas ha mejorado en un 15%. Estos resultados respaldan la replicabilidad del enfoque y la guía de operación desarrollados, que pueden aplicarse a otros hospitales y entornos críticos en regiones propensas a inundaciones. Las conclusiones sugieren que la metodología BIM y la guía de operación ofrecen una solución eficaz para la gestión de inundaciones y la operación continua de tanques de tormentas, brindando un entorno hospitalario más seguro y confiable. Se recomienda continuar con la capacitación del personal, mantener un programa de mantenimiento preventivo sólido y compartir estos resultados y mejores prácticas con otras instituciones similares.

In this study, the implementation of a guide for the operation stage of a stormwater tank at Chulucanas Hospital, Piura, using the Building Information Modeling (BIM) methodology to prevent flooding and ensure uninterrupted operation of the medical institution is examined. Results demonstrate that the application of this guide has led to continuous operation of the stormwater tank for 99.5% of the time, a 40% reduction in annual floods, and a 50% decrease in flood-related property damage. Furthermore, the satisfaction of hospital staff and users has significantly improved, with satisfaction rates of 90% and 80%, respectively. The response time to emergencies has been reduced by 25%, and the stormwater tank's evacuation capacity has improved by 15%. These findings support the replicability of the developed approach and operation guide, which can be applied to other hospitals and critical environments in flood-prone regions. The conclusions suggest that the BIM methodology and the operation guide provide an effective solution for flood management and continuous operation of stormwater tanks, resulting in a safer and more reliable hospital environment. It is recommended to continue staff training, maintain a strong preventive maintenance program, and share these results and best practices with other similar institutions.
Discipline: Ingeniería Civil
Grade or title grantor: Universidad Peruana de Ciencias Aplicadas (UPC). Facultad de Ingeniería
Grade or title: Ingeniero Civil
Juror: Castillo Navarro, Leonardo Franco; Guzman Zorrilla, Emanuel
Register date: 12-Jan-2024



This item is licensed under a Creative Commons License Creative Commons