Tuero, J., Rojas, M. (2023). Proceso constructivo del muro circular de 65 metros de altura, de la nueva torre de control del Aeropuerto Jorge Chávez, Lima - Perú, aplicando el encofrado trepante [Trabajo de Suficiencia Profesional, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/670578
Tuero, J., Rojas, M. Proceso constructivo del muro circular de 65 metros de altura, de la nueva torre de control del Aeropuerto Jorge Chávez, Lima - Perú, aplicando el encofrado trepante [Trabajo de Suficiencia Profesional]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2023. http://hdl.handle.net/10757/670578
@misc{renati/410474,
title = "Proceso constructivo del muro circular de 65 metros de altura, de la nueva torre de control del Aeropuerto Jorge Chávez, Lima - Perú, aplicando el encofrado trepante",
author = "Rojas Atauqui, Mauro Mark",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2023"
}
The purpose of this research is to present in a clear way what the “Constructive Process of the Circular Wall with the Climbing Formwork” was, where two systems intervene such as the Enkoform VMK and Climbing brackets BMK. Besides, the Brio system was used for the steel work operations. Additionally, the quality control process of the climbing formwork used in the project will be explained. This method is seen as a practical, fast and modern solution for the constructive processes of high-rise infrastructure. To do so, a collection of technical information from the Control Tower was gathered in order to get data from the execution of the walls. As a final result, it is concluded that the climbing formwork system allows optimizing time, cost and the finish quality of the concrete wall. Despite its costs being higher compared to the conventional formwork, its highest speed gained in the medium and long-term surpasses the traditional system. On the other hand, the company will provide the material, will model the formwork design and will give training that will technify workers and engineers, before and during the constructive process. These will be key points for the optimal growth of the presented solution in the shaft.