Picoy, P., Taboada, L. (2021). Propuesta de guía de implementación de herramientas de Lean Construction para reducir la variabilidad de productividad en proyectos de infraestructura vial en Lima Metropolitana [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/658110
Picoy, P., Taboada, L. Propuesta de guía de implementación de herramientas de Lean Construction para reducir la variabilidad de productividad en proyectos de infraestructura vial en Lima Metropolitana [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2021. http://hdl.handle.net/10757/658110
@misc{renati/397799,
title = "Propuesta de guía de implementación de herramientas de Lean Construction para reducir la variabilidad de productividad en proyectos de infraestructura vial en Lima Metropolitana",
author = "Taboada Portilla, Luisa Jimena Isabela Mariela",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2021"
}
The purpose of present thesis is to reduce the variability in the productivity of the road project “Mejoramiento de la transitabilidad vehicular y peatonal de la Av. Paul Poblet Lind desde el Jr. Comercio, Zona 1, hasta el puente Inca Moya, centro poblado de Cieneguilla - Distrito de Cieneguilla - Provincia de Lima - Región de Lima” applying an implementation guide of tools and methodologies of Lean Construction, which mainly were Visual Management and the Last Planner System (LPS). For the implementation and application of the Lean Construction tools previously referred, the work methodology of present research includes the elaboration of the proposed guide same that suggest a workflow of work planification in road projects focusing on Lean Construction in order to have a better control of the activities advance, use of resources and production, as well as to fulfill the commitments and goals during the execution of the project. The proposed guide was applied since the 30th. week until the 36th week of the study project. During this stage, the Restriction Analysis, Percentage of Plan Completed (PPC), Reasons for Non-Compliance (RNC) and Percentage of Constraint Removal (PCR) were weekly made. These indicators were finally related to the results of the productivity curves of the selected control items. All of this aligned to improve the productivity, achieving like this, that the real accumulated productivity of the control items, will be superior to the budget, demonstrating that no losses were obtained on the production system.