El objetivo de la investigación fue proponer estrategias para mejorar la logística de transporte de una empresa contratista de obras civiles, determinando las operaciones logísticas que no agregan valor al proceso y generan un incremento en los costos de transporte. La metodología se basó en primer lugar, en el diagnóstico de la empresa, mediante un mapeo de la cadena de valor y la verificacion de los procedimientos mediante un mapeo completo del proceso logistico, determinándose la actividad que no genera valor a la logística del transporte, luego de la verificacion del problema y las causas raíz se analizaron mediante el diagrama causa-efecto, la técnica de grupo nominal, el diagrama de Pareto y lo 5W, obteniéndose 4 causas que representan el 82,08% del problema, luego se realizó un diagrama de Gantt para la planificación de la implementación de las estrategia, en el cual tuvo una duración de 24 días, seguidamente, se desarrolló la cadena de suministro y característica del proceso de transporte, se estableció CTQ’s, el tiempo de ciclo para la capacidad del proceso, donde se obtuvo un Cp=0.05, Cpk<1, nivel sigma de 3 donde se detalla el incumplimiento del 49%, luego se realizó un análisis FODA donde se obtuvo 12 estrategias a aplicar, después de priorizar las misma, se desarrollaron las siguientes: 1) estrategias de misión y visión, 2) procedimientos para la gestión de logística de transporte y 3) evaluación de proveedores. Se concluye con la validación de las mejoras propuestas realizada con la simulación del proceso, usando el software Arena, que si logramos aplicar una adecuada gestión de proveedores y mejoras en los procedimientos de trabajo basados en la metodología DMAIC, lograremos reducir: el tiempo promedio de entrega de ordenes en un 12.07%, las entregas de órdenes retrasadas de 42.75% (escenario 1) a 20.58 %(escenario 3) y finalmente, incrementar las entregas de órdenes a tiempo de 57.25% (escenario 1) a 79.42%(escenario 3). (es_PE)
The objective of the research was to propose strategies to improve the transport logistics of a civil works contractor, determining the logistics operations that do not add value to the process and generate an increase in transport costs. The methodology was based in the first place, on the diagnosis of the company, through a mapping of the value chain and the verification of the procedures through a complete mapping of the logistics process, determining the activity that does not generate value to the transport logistics, After verifying the problem and the root causes, they were analyzed using the cause-effect diagram, the nominal group technique, the Pareto diagram and the 5W, obtaining 4 causes that represent 82.08% of the problem, then a Gantt chart was made for the planning of the implementation of the strategies, in which it lasted 24 days, then the supply chain and characteristic of the transportation process were developed, CTQ's were established, the cycle time for the process capacity, where a Cp = 0.05, Cpk <1, sigma level of 3 where the non-compliance of 49% is detailed, then a SWOT analysis was carried out where 12 strategies were obtained to apply, after prioritizing the same , the following were developed: 1) mission and vision strategies, 2) procedures for transport logistics management and 3) supplier evaluation. It concludes with the validation of the proposed improvements carried out with the simulation of the process, using the Arena software, (es_PE)
Trabajo de Suficiencia Profesional (es_PE)
application/pdf (es_PE)
application/msword (es_PE)
application/epub (es_PE)
spa (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
info:eu-repo/semantics/openAccess (es_PE)
http://creativecommons.org/licenses/by-nc-sa/4.0/ (*)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
Repositorio Académico - UPC (es_PE)
Logística (es_PE)
Transporte (es_PE)
Reducción de costos (es_PE)
Mejora de procesos (es_PE)
Logistics (es_PE)
Transport (es_PE)
Costs reduction (es_PE)
Process improvement (es_PE)
Estrategias para mejorar la logística de transporte de una empresa contratista de obras civiles para disminuir los costos de transporte (es_PE)
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC). Facultad de Ingeniería (es_PE)
Ingeniería Industrial (es_PE)
Licenciatura (es_PE)
Ingeniero industrial (es_PE)
PE (es_PE)
http://purl.org/pe-repo/ocde/ford#2.00.00 (es_PE)
https://purl.org/pe-repo/ocde/ford#2.11.04 (es_PE)
https://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
https://orcid.org/0000-0002-1732-8788 (es_PE)
722026 (es_PE)
https://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional
Privada societaria



This item is licensed under a Creative Commons License Creative Commons