Bibliographic citations
Alca, K., Bernuy, O. (2020). Propuesta de mitigación del tránsito en el área de influencia del proyecto de centro comercial: “Portal La Molina” [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/655855
Alca, K., Bernuy, O. Propuesta de mitigación del tránsito en el área de influencia del proyecto de centro comercial: “Portal La Molina” [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2020. http://hdl.handle.net/10757/655855
@misc{renati/395218,
title = "Propuesta de mitigación del tránsito en el área de influencia del proyecto de centro comercial: “Portal La Molina”",
author = "Bernuy Casanova, Oskar Alonso Andress",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2020"
}
The objective of this thesis is to propose mitigation measures that allow reducing traffic congestion on the road network around the Shopping Center to be built in the La Molina district called “Portal La Molina”. To do this, based on a theoretical and practical analysis, according to the detailed segmentation methodology in the Highway Capacity Manual 2010 (HCM 2010), vehicle counts were carried out for three days in January 2020 at the three critical intersections around of the project. With these data, the service levels of the three analyzed intersections were determined, these being level “D”, “C” and “C” for the current situation. Then, considering a future situation projected to 5 years which includes the operation of the “Portal La Molina“ Shopping Center, a result of service level “F“, “D“ and “F“ was obtained. Likewise, both scenarios were simulated in Synchro Studio 9 software, managing to represent the geometric characteristics of the road, vehicle entry and exit, vehicle queues, volume and capacity of the intersections. Subsequently, these results were compared with those obtained from the simulation of the measures proposed by the approved Road impact study of the project. Finally, to solve this situation, modifications were made such as the implementation of traffic lights, optimization of the traffic light cycle, modification of lanes, change of vehicular and pedestrian accesses, which resulted in a service level “F“, “C“ and “C”. Which allows to comply with the reduction of congestion in the area of influence of the project.
This item is licensed under a Creative Commons License