Aronés, M., Mendoza, A. (2020). Guía de labores de control usando herramientas digitalizadas para optimizar los tiempos del staff de Producción en partidas de concreto armado de edificaciones multifamiliares en Lima Metropolitana [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/653223
Aronés, M., Mendoza, A. Guía de labores de control usando herramientas digitalizadas para optimizar los tiempos del staff de Producción en partidas de concreto armado de edificaciones multifamiliares en Lima Metropolitana [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2020. http://hdl.handle.net/10757/653223
@misc{renati/391974,
title = "Guía de labores de control usando herramientas digitalizadas para optimizar los tiempos del staff de Producción en partidas de concreto armado de edificaciones multifamiliares en Lima Metropolitana",
author = "Mendoza Fajardo, Andrea De Fátima",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2020"
}
In the stages that are in the construction projects, there is the control and monitoring stage, which is responsible for confirming that the project is within the time, cost and limited scope. Currently, the monitoring system consists of collecting the field information, writing it manually and later, on the computer. Those responsible for making the reports through this process, dedicate between 28% and 41% of their time daily for their elaboration. This traditional process is labored and ineffective because the information is dispersed in different documents, so data can be omitted, causing corrective actions not to be taken in time. Likewise, the construction sector has little use of technological resources and therefore, there are no automated processes which makes it easier to monitor construction projects in an efficient way. Due to this, the present investigation proposes the optimization of the control process through the use of a digital tool to reduce the time spent on advance control. With the implementation of this proposal, the hours spent by staff in control work were reduced by 37%.