Corrales, J., Saravia, R. (2020). Implementación de la metodología Virtual Design & Construction - VDC en las etapas de Diseño y Construcción para reducir el plazo en proyectos de edificaciones en el Perú [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/651670
Corrales, J., Saravia, R. Implementación de la metodología Virtual Design & Construction - VDC en las etapas de Diseño y Construcción para reducir el plazo en proyectos de edificaciones en el Perú [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2020. http://hdl.handle.net/10757/651670
@misc{renati/390275,
title = "Implementación de la metodología Virtual Design & Construction - VDC en las etapas de Diseño y Construcción para reducir el plazo en proyectos de edificaciones en el Perú",
author = "Saravia Torres-Llosa, Renzo Enrique",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2020"
}
Currently, building projects being executed, generally, do not have a defined engineering at the beginning of the construction stage. This situation generates that the projects have numerous undefinitions in their beginning. As a result, consultations, change orders, and definitions are given in greater quantity in the execution stage, increasing the effort and therefore increasing the contractual term in the solution of any rework. Traditional, non-collaborative, methodologies usually have as a common denominator, the large number of requests for information during construction. This situation added to a slow response flow to field requests can end up being detrimental to the timely delivery of the project. This VDC methodology is based on “build” twice, in other words, previously build the project in a virtual model with all the specialties consolidated and compatible for, once having the model released and free of undefinitions, to proceed with the actual construction. This methodology seeks to reduce unnecessary resources and reduce variability through collaborative work through ICE sessions in the joint use of technological tools (BIM) and Lean philosophies. The present thesis demonstrates that, having an integrated model in the design stage and accompanied by a collaborative team in ICE sessions, it is possible to transfer efforts from construction to design stage in order to reduce execution time of building projects.