Palomino, J., (2021). Diseño virtual BIM 4D de proyecto vivienda multifamiliar de 4 niveles en la urbanización las orquídeas de Trujillo [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/7021
Palomino, J., Diseño virtual BIM 4D de proyecto vivienda multifamiliar de 4 niveles en la urbanización las orquídeas de Trujillo [Tesis]. PE: Universidad Privada Antenor Orrego - UPAO; 2021. https://hdl.handle.net/20.500.12759/7021
@misc{renati/380927,
title = "Diseño virtual BIM 4D de proyecto vivienda multifamiliar de 4 niveles en la urbanización las orquídeas de Trujillo",
author = "Palomino Rodríguez, José Steve",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2021"
}
In recent years, planning is playing a fundamental role in the growth of the construction sector. In contrast, building an adequate plan creates one of the most arduous challenges for the team of specialists of construction companies. A wide variety of methodologies has been investigated and implemented but they are not suitable enough to enrich the profitability of the item. There is still an excessive dissimilarity between the execution and the plan. Therefore, an effective and objective planning system is required to increase performance and reduce the risk of cost overruns and delays. This thesis is oriented to the development of the 4D BIM dimension, generated from a 3D Revit parametric model and its link with the Ms Project work schedule, through Navisworks, where you can visualize the construction simulation, and detect interferences between specialties of architecture and structure to be able to eliminate them in a timely manner. In addition, a comparison will be made between the BIM Revit architecture and structure quantification and the traditional one, in order to achieve more real and accurate results. The study concluded that 4D modeling is a conducive tool for construction planning. The most eloquent utilities of this, are a superior representation of construction work, better communication between stakeholders and greater efficiency in planning. In addition, it assists planners in obtaining essential work details and ideas, planning the interim structure, and logistical management of the area