Bibliographic citations
Briceño, C., Tello, P. (2019). Análisis comparativo del diseño estructural y evaluación económica entre un pavimento rígido, flexible y adoquinado utilizando el método ASSHTO-93 para la av. miguel grau, tres de octubre, nuevo Chimbote [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/4771
Briceño, C., Tello, P. Análisis comparativo del diseño estructural y evaluación económica entre un pavimento rígido, flexible y adoquinado utilizando el método ASSHTO-93 para la av. miguel grau, tres de octubre, nuevo Chimbote [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2019. https://hdl.handle.net/20.500.12759/4771
@misc{renati/379850,
title = "Análisis comparativo del diseño estructural y evaluación económica entre un pavimento rígido, flexible y adoquinado utilizando el método ASSHTO-93 para la av. miguel grau, tres de octubre, nuevo Chimbote",
author = "Tello Vásquez, Pool Ulises",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2019"
}
This investigation has as goal main to perform a comparative analysis of structural design and financial evaluation amongst rigid and flexible pavement as well as sett paving. For this, the present research consists of 8 chapters. The first chapter is an introduction to the predicament found in the project development, focusing in the reality of the area’s issues that are being studied, also revealing that main and specific objectives, and justification of this research. In the second chapter, a description is made of the encountered contributions as background and a definition of the concepts related to the project. In the third chapter, a summary of materials and methods used in the elaboration of this study is presented, as well as the procedures for the design of the established system, through the study of the process and analysis of data. In the fourth chapter, the flexible and rigid pavement and the sett paving is designed with Methodology AASHTO 93. The widths of each paving’s were calculated and the according budget was executed. In the fifth chapter, the discussion of the obtained results of the project is presented, followed by a technical and financial comparison of the three kinds of pavement. Finally, in the sixth, seventh and eighth chapter, the conclusions, recommendations and references are given.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.