Pérez, J., Cuba, R. (2021). Análisis de la productividad aplicando Last Planner System en la obra de regularización de la infraestructura del Centro Comercial Lima Oulet Center, 2020 [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/7099
Pérez, J., Cuba, R. Análisis de la productividad aplicando Last Planner System en la obra de regularización de la infraestructura del Centro Comercial Lima Oulet Center, 2020 [Tesis]. PE: Universidad Privada Antenor Orrego - UPAO; 2021. https://hdl.handle.net/20.500.12759/7099
@misc{renati/379544,
title = "Análisis de la productividad aplicando Last Planner System en la obra de regularización de la infraestructura del Centro Comercial Lima Oulet Center, 2020",
author = "Cuba Aguirre, Roberto Carlos",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2021"
}
The objetive of this thesis was to demonstrate the benefits that are achieved by applying the Last Planner System methodology in the execution of a building work, these benefits are reflected in the optimization of productivity, cost and compliance with the schedule. The dissemination and application of this Lean Construction tool has been implemented by certain companies in Peru, which have been applying it with positive results. The Last Planner System aims to bring the general objectives of the project to day-to-day reality, transforming general ideas into real programs, subdividing programming by area and zones, applying cascade programming tools. This cascading schedule is organized into three levels: long-term (Master Schedule), medium-term (Lookahead Program) and short-term (Weekly Work Plan). Throughout this thesis, the main concepts and tools of lean Production, Lean Construction and Last Planner System are described, with the purpose that the chapters show the application of these, and in the execution of the REGULARIZATION OF THE INFRASTRUCTURE OF THE CENTER COMMERCIAL LIMA OULET-CENTER. Finally, the productivity obtained by the company in the execution of the shopping center was analyzed versus the productivity that it would have achieved if the Last Planner System had been used in the execution of said shopping center. Found a 3% increase in productivity.