Bibliographic citations
López, J., Quesquén, D. (2024). Implementación de Guía PMBOK, 6ta.edicion para fortalecer, gestión de riesgos, cronograma, costos y calidad de la obra: mejoramiento de redes para agua potable y alcantarillado en los sectores Paranshique Alto, Centro Bajo y las Cortaderas - Huamachuco [Tesis, Universidad Privada Antenor Orrego]. https://hdl.handle.net/20.500.12759/18371
López, J., Quesquén, D. Implementación de Guía PMBOK, 6ta.edicion para fortalecer, gestión de riesgos, cronograma, costos y calidad de la obra: mejoramiento de redes para agua potable y alcantarillado en los sectores Paranshique Alto, Centro Bajo y las Cortaderas - Huamachuco [Tesis]. PE: Universidad Privada Antenor Orrego; 2024. https://hdl.handle.net/20.500.12759/18371
@misc{renati/378307,
title = "Implementación de Guía PMBOK, 6ta.edicion para fortalecer, gestión de riesgos, cronograma, costos y calidad de la obra: mejoramiento de redes para agua potable y alcantarillado en los sectores Paranshique Alto, Centro Bajo y las Cortaderas - Huamachuco",
author = "Quesquén Salvatierra, David Humberto",
publisher = "Universidad Privada Antenor Orrego",
year = "2024"
}
The objective of the research was to implement the PMBOK GUIDE, 6th edition to strengthen, risk management, schedule, costs and quality of the work: improvement of drinking water and sewerage networks in the Paranshique Alto, Centro Bajo and Las Cortaderas sectors. Huamachuco. A descriptive, pre-experimental applied research methodology was used. It had as a sample the drinking water and sewerage work, improvement of drinking water and sewerage networks in the sectors of Paranshique Alto, Centro Bajo and Las Cortaderas - Huamachuco. This is expected to implement the PMBOK Guide in project management processes to avoid cost overruns and overruns that arise due to poor management. This research proposes to develop formats to follow the methodology of the PMBOK Guide, in the areas of Risks, Costs, Schedule and Quality, and to use the monitoring and control technique called Earned Value, by means of this technique, results such as shorter time periods, higher profits for the contractor and better quality in the deliverables are presented.
This item is licensed under a Creative Commons License